Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
 
(16 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule]
 
* [http://calendar.google.com Google Calendar]
 
* [http://calendar.google.com Google Calendar]
 +
 +
==Monday, April 18==
 +
# Accelerator Status
 +
#*  Good running over the weekend, 42 hours from 8 shifts.
 +
#*  No scheduled accelerator interruption until Wednesday.
 +
# Hall-D/GlueX items
 +
#* PARA/PERP Luminosity difference
 +
#** PARA  160 nA, 29 kHz (overnight)
 +
#** PERP  200 nA, 24 kHz (overnight)
 +
#* Goniometer/collimator stage issues
 +
#* [https://logbooks.jlab.org/entry/3400181 Occupancy Plots]
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 +
# Run Plan
 +
#* Para/Perp luminosity studies?
 +
#* Trigger studies?
 +
#* Mode 8 (raw mode) running
 +
#* Production 50 um
 +
# Offline Analysis?
 +
# AOB?
 +
 +
==Saturday, April 16==
 +
# Accelerator Status
 +
#*  5th pass separator trip cost a couple of hours
 +
#*  No scheduled accelerator interruption until Tuesday
 +
# Hall-D/GlueX items
 +
#* [https://logbooks.jlab.org/entry/3399513 Occupancy Plots]
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 +
# Run Plan
 +
#* Para/Perp luminosity studies
 +
#* Trigger studies
 +
#* Production 50 um
 +
# Offline Analysis?
 +
# AOB?
 +
 +
==Friday, April 15==
 +
# Accelerator Status
 +
#* Beam went down at 8am Tuesday for beam studies. Expected back at noon.
 +
#* ion chambers calibrated .... maybe
 +
#* Running with 5th-pass separator
 +
#* Hall-B becomes priority 15:00 Friday
 +
# Hall-D/GlueX items
 +
#* '''NO PARKING ON SOUTH OR NORTH SIDE OF ROAD'''
 +
#* Latest scans: [https://logbooks.jlab.org/entry/3398835 5C11,5C11B] , [https://logbooks.jlab.org/entry/3398835 Hall-D]
 +
#* Collimator Motor not responding
 +
#* Empty run complete
 +
#* TRD Run complete
 +
#* Trigger Studies
 +
#* Quadrupole Test complete
 +
#* Tagger Microscope alignment complete
 +
#* other systems?
 +
# Run Plan
 +
#* Trigger Studies
 +
#* Active Collimator Raster? - Todd/Richard
 +
#* High Luminosity w/o ER
 +
#* Production Running 50um
 +
# Offline analysis?
 +
#* [https://logbooks.jlab.org/entry/3398923 Vertex Distributions] (Simon)
 +
#* [https://logbooks.jlab.org/entry/3398795 Accidental \rho& rates vs. collimator size] (Justin)
 +
#* [https://logbooks.jlab.org/entry/3399169 Accidental rates vs collimator size] (Richard)
 +
# AOB?
 +
# RC: David Lawrence -> Mark Dalton
 +
 +
==Thursday, April 14==
 +
 +
# Accelerator Status
 +
#* Beam went down at 8am Tuesday for beam studies. Expected back at noon.
 +
#* ion chambers calibrated .... maybe
 +
#* Running with 5th-pass separator
 +
#* Hall-B becomes priority 15:00 Friday
 +
# Hall-D/GlueX items
 +
#* Latest scans: [https://logbooks.jlab.org/entry/3398753 5C11,5C11B] , ''no Hall-D harp scan''
 +
#* [https://logbooks.jlab.org/entry/3398664 High Luminosity Test]
 +
#** JD70-119 20um
 +
#** 200nA, 250nA, 300nA, 350nA, 400nA (runs 11359-11363)
 +
#** CDC inner ring HV current limit raised from 12uA to 16uA (restored after)
 +
#* TAC run complete
 +
#* TRD run
 +
#* [https://logbooks.jlab.org/entry/3398746 Quadrupole measurement]
 +
#* other systems?
 +
# Run Plan
 +
#* Empty Target Run
 +
#* TRD run '''~1hr''' (Lubomir, Sergey)
 +
#* Trigger Studies - '''NO PARKING ON SOUTH SIDE OF ROAD'''
 +
#** Requires individual thresholds
 +
#* [https://logbooks.jlab.org/entry/3393844 Quadrupole test] ([https://logbooks.jlab.org/entry/3397865 partial progress1][https://logbooks.jlab.org/entry/3398324 partial progress2][https://logbooks.jlab.org/entry/3398677 partial progress3])
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running on 50um diamond]
 +
#* Mode 8 run w/ Amorphous '''~1hr'''
 +
#* Active Collimator Raster
 +
# Offline analysis?
 +
# AOB?
  
 
==Wednesday, April 13==
 
==Wednesday, April 13==
Line 7: Line 97:
 
#* Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until~2am.
 
#* Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until~2am.
 
#* [https://logbooks.jlab.org/entry/3398430 Ion chambers not reporting since 3/27]
 
#* [https://logbooks.jlab.org/entry/3398430 Ion chambers not reporting since 3/27]
 +
#* Hall-A getting 5-pass beam
 +
#* Beam studies starting ~8am Thursday
 +
#* Hall-B becomes priority 15:00 Friday
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
Line 14: Line 107:
 
#* [https://logbooks.jlab.org/entry/3398268 Occupancy Plots]
 
#* [https://logbooks.jlab.org/entry/3398268 Occupancy Plots]
 
#* Latest scans: [https://logbooks.jlab.org/entry/3398296 5C11,5C11B] , [https://logbooks.jlab.org/entry/3398305 Hall-D harp scan]
 
#* Latest scans: [https://logbooks.jlab.org/entry/3398296 5C11,5C11B] , [https://logbooks.jlab.org/entry/3398305 Hall-D harp scan]
 +
#* [https://logbooks.jlab.org/entry/3398437 Current fluctuations]
 
#* other systems?
 
#* other systems?
 
# Run Plan
 
# Run Plan

Latest revision as of 08:43, 18 April 2016

Monday, April 18

  1. Accelerator Status
    • Good running over the weekend, 42 hours from 8 shifts.
    • No scheduled accelerator interruption until Wednesday.
  2. Hall-D/GlueX items
    • PARA/PERP Luminosity difference
      • PARA 160 nA, 29 kHz (overnight)
      • PERP 200 nA, 24 kHz (overnight)
    • Goniometer/collimator stage issues
    • Occupancy Plots
    • Run Statistics
  3. Run Plan
    • Para/Perp luminosity studies?
    • Trigger studies?
    • Mode 8 (raw mode) running
    • Production 50 um
  4. Offline Analysis?
  5. AOB?

Saturday, April 16

  1. Accelerator Status
    • 5th pass separator trip cost a couple of hours
    • No scheduled accelerator interruption until Tuesday
  2. Hall-D/GlueX items
  3. Run Plan
    • Para/Perp luminosity studies
    • Trigger studies
    • Production 50 um
  4. Offline Analysis?
  5. AOB?

Friday, April 15

  1. Accelerator Status
    • Beam went down at 8am Tuesday for beam studies. Expected back at noon.
    • ion chambers calibrated .... maybe
    • Running with 5th-pass separator
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
    • NO PARKING ON SOUTH OR NORTH SIDE OF ROAD
    • Latest scans: 5C11,5C11B , Hall-D
    • Collimator Motor not responding
    • Empty run complete
    • TRD Run complete
    • Trigger Studies
    • Quadrupole Test complete
    • Tagger Microscope alignment complete
    • other systems?
  3. Run Plan
    • Trigger Studies
    • Active Collimator Raster? - Todd/Richard
    • High Luminosity w/o ER
    • Production Running 50um
  4. Offline analysis?
  5. AOB?
  6. RC: David Lawrence -> Mark Dalton

Thursday, April 14

  1. Accelerator Status
    • Beam went down at 8am Tuesday for beam studies. Expected back at noon.
    • ion chambers calibrated .... maybe
    • Running with 5th-pass separator
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
    • Latest scans: 5C11,5C11B , no Hall-D harp scan
    • High Luminosity Test
      • JD70-119 20um
      • 200nA, 250nA, 300nA, 350nA, 400nA (runs 11359-11363)
      • CDC inner ring HV current limit raised from 12uA to 16uA (restored after)
    • TAC run complete
    • TRD run
    • Quadrupole measurement
    • other systems?
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Wednesday, April 13

  1. Accelerator Status
    • Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until~2am.
    • Ion chambers not reporting since 3/27
    • Hall-A getting 5-pass beam
    • Beam studies starting ~8am Thursday
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

https://logbooks.jlab.org/entry/3398268

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?