Line 7: Line 7:
 
#* Beam went down at 7am for work in SL.
 
#* Beam went down at 7am for work in SL.
 
#* Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
 
#* Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
#* Beam expected back sometime during swing shift
+
#* Beam expected back late during swing shift or early owl
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
#* https://logbooks.jlab.org/entry/3397771
+
#** [https://logbooks.jlab.org/entry/3397702 Initial indications]
 +
#** Repair plan
 +
#** [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring]
 +
#* https://logbooks.jlab.org/entry/3397771 Pulser Trigger]
 
#* Latest scans: [https://logbooks.jlab.org/entry/3397829 5C11,5C11B] , [https://logbooks.jlab.org/entry/3397842 Hall-D harp scan]
 
#* Latest scans: [https://logbooks.jlab.org/entry/3397829 5C11,5C11B] , [https://logbooks.jlab.org/entry/3397842 Hall-D harp scan]
 
#* other systems?
 
#* other systems?
Line 18: Line 21:
 
#* Halo Linearity scan (Hovanes)
 
#* Halo Linearity scan (Hovanes)
 
#* Harp scan collection
 
#* Harp scan collection
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running]
+
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running on 50um diamond]
#** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test]
+
#** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test] ([https://logbooks.jlab.org/entry/3397865 partial progress])
 
#** Parasitic DAQ livetime/RAID test
 
#** Parasitic DAQ livetime/RAID test
 
# Offline analysis?
 
# Offline analysis?
 +
#* [https://logbooks.jlab.org/entry/3397606 TPOL analysis]
 
# AOB?
 
# AOB?
 
==Monday, April 11==
 
==Monday, April 11==

Revision as of 08:33, 12 April 2016

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?