Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 
#** [https://logbooks.jlab.org/entry/3397702 Initial indications]
 
#** [https://logbooks.jlab.org/entry/3397702 Initial indications]
#** Repair plan
+
#** Assessment and Repair plan
 +
#** Safety walkthrough
 
#** [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring]
 
#** [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring]
 
#* https://logbooks.jlab.org/entry/3397771 Pulser Trigger]
 
#* https://logbooks.jlab.org/entry/3397771 Pulser Trigger]

Revision as of 08:35, 12 April 2016

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?