Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule]
 
* [http://calendar.google.com Google Calendar]
 
* [http://calendar.google.com Google Calendar]
 +
 +
==Wednesday, April 13==
 +
 +
# Accelerator Status
 +
#* Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until ...
 +
# Hall-D/GlueX items
 +
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 +
#** CDC Repairs, Area survey for magnetic materials
 +
#** Solenoid ramped to 1200A without incident
 +
#* [https://halldweb.jlab.org/hdops/wiki/index.php/Online_Monitoring_Shift Online Monitoring]
 +
#* [https://logbooks.jlab.org/entry/3398268 Occupancy Plots]
 +
#* Latest scans: [https://logbooks.jlab.org/entry/3397829 5C11,5C11B] , [https://logbooks.jlab.org/entry/3397842 Hall-D harp scan]
 +
#* other systems?
 +
# Run Plan
 +
#* <font size="+4">Trigger Studies</font>
 +
#* Mode 8 run w/ Amorphous '''~1hr'''
 +
#* TRD runs '''~1hr''' (Lubomir, Sergey)
 +
#* Halo Linearity scan (Hovanes)
 +
#* Harp scan collection
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running on 50um diamond]
 +
#** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test] ([https://logbooks.jlab.org/entry/3397865 partial progress])
 +
#** Parasitic DAQ livetime/RAID test
 +
# Offline analysis?
 +
#* [https://logbooks.jlab.org/entry/3397606 TPOL analysis]
 +
# AOB?
 +
 +
https://logbooks.jlab.org/entry/3398268
  
 
==Tuesday, April 12==
 
==Tuesday, April 12==
Line 28: Line 55:
 
#* [https://logbooks.jlab.org/entry/3397606 TPOL analysis]
 
#* [https://logbooks.jlab.org/entry/3397606 TPOL analysis]
 
# AOB?
 
# AOB?
 +
 
==Monday, April 11==
 
==Monday, April 11==
  

Revision as of 23:42, 12 April 2016

Wednesday, April 13

  1. Accelerator Status
    • Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until ...
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

https://logbooks.jlab.org/entry/3398268

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?