Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
Line 15: Line 15:
 
#* other systems?
 
#* other systems?
 
# Run Plan
 
# Run Plan
 +
#* TRD runs '''~1hr''' (Lubomir, Sergey)
 +
#* TAC Run
 
#* <font size="+4">Trigger Studies</font>
 
#* <font size="+4">Trigger Studies</font>
 +
#* Tagger alignment '''~1hr''' (Alex B.)
 
#* Mode 8 run w/ Amorphous '''~1hr'''
 
#* Mode 8 run w/ Amorphous '''~1hr'''
#* TRD runs '''~1hr''' (Lubomir, Sergey)
 
 
#* Halo Linearity scan (Hovanes)
 
#* Halo Linearity scan (Hovanes)
 
#* Harp scan collection
 
#* Harp scan collection
Line 24: Line 26:
 
#** Parasitic DAQ livetime/RAID test
 
#** Parasitic DAQ livetime/RAID test
 
# Offline analysis?
 
# Offline analysis?
#* [https://logbooks.jlab.org/entry/3397606 TPOL analysis]
 
 
# AOB?
 
# AOB?
  

Revision as of 23:44, 12 April 2016

Wednesday, April 13

  1. Accelerator Status
    • Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until ...
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

https://logbooks.jlab.org/entry/3398268

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?