==Friday, April 15==
 +
 +
# Accelerator Status
 +
#* Beam went down at 8am Tuesday for beam studies. Expected back at noon.
 +
#* ion chambers calibrated .... maybe
 +
#* Running with 5th-pass separator
 +
#* Hall-B becomes priority 15:00 Friday
 +
# Hall-D/GlueX items
 +
#* '''NO PARKING ON SOUTH OR NORTH SIDE OF ROAD'''
 +
#* Latest scans: [https://logbooks.jlab.org/entry/3398835 5C11,5C11B] , [https://logbooks.jlab.org/entry/3398835 Hall-D]
 +
#* Collimator Motor not responding
 +
#* Empty run complete
 +
#* TRD Run complete
 +
#* Trigger Studies
 +
#* Quadrupole Test complete
 +
#* Tagger Microscope alignment complete
 +
#* other systems?
 +
# Run Plan
 +
#* TRD run '''~1hr''' (Lubomir, Sergey)
 +
#* Trigger Studies
 +
#** Requires individual thresholds
 +
#* Active Collimator Raster - Todd/Richard
 +
# Offline analysis?
 +
#* [https://logbooks.jlab.org/entry/3398923 Vertex Distributions] (Simon)
 +
#* [https://logbooks.jlab.org/entry/3398795 Accidental \rho& rates vs. collimator size] (Justin)
 +
# AOB?
 
==Thursday, April 14==
 
==Thursday, April 14==
  

Revision as of 08:06, 15 April 2016


Friday, April 15

  1. Accelerator Status
    • Beam went down at 8am Tuesday for beam studies. Expected back at noon.
    • ion chambers calibrated .... maybe
    • Running with 5th-pass separator
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
    • NO PARKING ON SOUTH OR NORTH SIDE OF ROAD
    • Latest scans: 5C11,5C11B , Hall-D
    • Collimator Motor not responding
    • Empty run complete
    • TRD Run complete
    • Trigger Studies
    • Quadrupole Test complete
    • Tagger Microscope alignment complete
    • other systems?
  3. Run Plan
    • TRD run ~1hr (Lubomir, Sergey)
    • Trigger Studies
      • Requires individual thresholds
    • Active Collimator Raster - Todd/Richard
  4. Offline analysis?
  5. AOB?

Thursday, April 14

  1. Accelerator Status
    • Beam went down at 8am Tuesday for beam studies. Expected back at noon.
    • ion chambers calibrated .... maybe
    • Running with 5th-pass separator
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
    • Latest scans: 5C11,5C11B , no Hall-D harp scan
    • High Luminosity Test
      • JD70-119 20um
      • 200nA, 250nA, 300nA, 350nA, 400nA (runs 11359-11363)
      • CDC inner ring HV current limit raised from 12uA to 16uA (restored after)
    • TAC run complete
    • TRD run
    • Quadrupole measurement
    • other systems?
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Wednesday, April 13

  1. Accelerator Status
    • Beam went down at 7am Tuesday for SL work followed by 5th pass separator test. It was gone until~2am.
    • Ion chambers not reporting since 3/27
    • Hall-A getting 5-pass beam
    • Beam studies starting ~8am Thursday
    • Hall-B becomes priority 15:00 Friday
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

https://logbooks.jlab.org/entry/3398268

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back late during swing shift or early owl
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?