Difference between revisions of "Run Planning Meeting Notes, August 6 - 12, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, August 7)
(Friday, August 7)
Line 10: Line 10:
 
#** "force para/perp" and "save as default" for each of the four settings
 
#** "force para/perp" and "save as default" for each of the four settings
 
#* [https://logbooks.jlab.org/entry/3821523 Trigger check-out] (Sasha)
 
#* [https://logbooks.jlab.org/entry/3821523 Trigger check-out] (Sasha)
#* TagH and PS HV scan, interrupted by pass change
+
#* [https://logbooks.jlab.org/entry/3821561 TagH] and PS HV scan, interrupted by pass change
 +
#* No beam since
 
# Reports/Issues
 
# Reports/Issues
 
#* Remind MCC to put in dumplet when changing radiators
 
#* Remind MCC to put in dumplet when changing radiators
 +
#* [https://logbooks.jlab.org/entry/3821734 BCal Pulser?]
 +
#* Monitoring:
 +
#** [https://logbooks.jlab.org/entry/3821683 Thursday Evening]
 +
#** [https://logbooks.jlab.org/entry/3821897 Friday Morning]
 +
#* [https://logbooks.jlab.org/entry/3821639 CPP Status]
 
# Run Plan
 
# Run Plan
 +
#* Harp Scan
 
#* Complete first production cycle with 350nA
 
#* Complete first production cycle with 350nA
  

Revision as of 07:44, 7 August 2020

<- Back to Run Coordination Meetings:Fall2019 Run

Integrated trigger count

Friday, August 7

  1. Last 24 hours
    • Diamond alignment check (Hovanes)
      • Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
      • Add screen shots of the coherent edges to logbook
      • "force para/perp" and "save as default" for each of the four settings
    • Trigger check-out (Sasha)
    • TagH and PS HV scan, interrupted by pass change
    • No beam since
  2. Reports/Issues
  3. Run Plan
    • Harp Scan
    • Complete first production cycle with 350nA

Thursday, August 6

  1. Last 24 hours
    • 5th pass separator problems after thunderstorm in the evening
    • Beam recovered around midnight
    • Harp scan: results
    • Radiation levels checked: similar to spring
  2. Reports/Issues
  3. Run Plan
    • Diamond alignment (Hovanes)
    • Trigger, PS, TagH check (Sasha)
    • Pass change at noon