== Wednesday, Dec 11 at 08:45 ==  
+
== Thursday, Dec 12 at 08:45 ==  
 
# Last 24h:
 
# Last 24h:
 
#* DIRC Gem data beam center data collected 1M trigger
 
#* DIRC Gem data beam center data collected 1M trigger
Line 23: Line 23:
 
#** https://logbooks.jlab.org/entry/3751650
 
#** https://logbooks.jlab.org/entry/3751650
 
#** https://logbooks.jlab.org/entry/3751968
 
#** https://logbooks.jlab.org/entry/3751968
 +
#
 +
== Thursday, Dec 12 at 08:45 ==
 +
# Last 24h:
 +
#* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
 +
#* The CPP test (1 hour) run was completed
 +
#* Overnight collected ~3 hours of DIRC commissioning data.
 +
#* 30 mins Raw mode data taken:
 +
#** hd_root crash: https://logbooks.jlab.org/entry/3752755
 +
#** Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
 +
# Issue:
 +
#* DAQ crash
 +
#* DIRC reference signal found in the stand alone configuration
 +
#* TAGM translation table
 +
#* Data corruption issue in the beginning of the run.
 +
#* rcdb event number issue.
 +
#* Monitoring anomaly observed by Alex:
 +
#** ST Timing: https://logbooks.jlab.org/entry/3752783
 +
#** normalization to amorphous run for beam monitoring in rootspy updated: https://logbooks.jlab.org/entry/3752755
 +
# Task for today
 +
#* Hall Work
 +
#** Relocate GEM/TRD
 +
#** Installing additional flash module
 +
#* Setting up high current test? (Sasha)
 +
# Plan for later
 +
#* Spin dance no longer scheduled
 +
#* Potential Hall C path change on Tuesday (Change GEM/TRD position again)
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3752719

Revision as of 09:33, 13 December 2019

Thursday, Dec 12 at 08:45

  1. Last 24h:
  2. Issue:
    • DAQ crash
      • DAQ issues (of manifest variety)
    • DIRC reference signal found in the stand alone configuration
    • Alarms for FDC HV
    • TAGM translation table
    • Data corruption issue in the beginning of the run.
    • rcdb event number issue.
  3. Task for today
    • Setting up high current test (Sasha)
    • CPP test crash (Dave)
  4. Plan for later

Thursday, Dec 12 at 08:45

  1. Last 24h:
    • DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
    • The CPP test (1 hour) run was completed
    • Overnight collected ~3 hours of DIRC commissioning data.
    • 30 mins Raw mode data taken:
  2. Issue:
  3. Task for today
    • Hall Work
      • Relocate GEM/TRD
      • Installing additional flash module
    • Setting up high current test? (Sasha)
  4. Plan for later