(Wednesday, Dec 17 at 08:45)
 
(17 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Wednesday, Dec 11 at 08:45 ==  
+
== Thursday, Dec 12 at 08:45 ==  
 
# Last 24h:
 
# Last 24h:
 
#* DIRC Gem data beam center data collected 1M trigger
 
#* DIRC Gem data beam center data collected 1M trigger
Line 8: Line 8:
 
# Issue:
 
# Issue:
 
#* DAQ crash
 
#* DAQ crash
 +
#** DAQ issues (of manifest variety)
 
#* DIRC reference signal found in the stand alone configuration
 
#* DIRC reference signal found in the stand alone configuration
 
#* Alarms for FDC HV
 
#* Alarms for FDC HV
 +
#* TAGM translation table
 +
#* Data corruption issue in the beginning of the run.
 +
#* rcdb event number issue.
 +
#** https://logbooks.jlab.org/entry/3751680
 
# Task for today
 
# Task for today
 
#* Setting up high current test (Sasha)
 
#* Setting up high current test (Sasha)
#* CPP test crash
+
#* CPP test crash (Dave)
 
# Plan for later
 
# Plan for later
 
#* No sping dance today. Spin dance maybe on Friday [http://accboard.acc.jlab.org/ whiteboard]
 
#* No sping dance today. Spin dance maybe on Friday [http://accboard.acc.jlab.org/ whiteboard]
 
#* Monitoring
 
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3751650
 
#** https://logbooks.jlab.org/entry/3751968
 
#** https://logbooks.jlab.org/entry/3751968
 +
 +
== Friday, Dec 13 at 08:45 ==
 +
# Last 24h:
 +
#* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
 +
#* The CPP test (1 hour) run was completed
 +
#* Overnight collected ~3 hours of DIRC commissioning data.
 +
#** Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV 
 +
#* 30 mins Raw mode data taken:
 +
#** hd_root crash: https://logbooks.jlab.org/entry/3752755
 +
# Issues:
 +
#* DAQ crash
 +
#* DIRC reference signal found in the stand alone configuration
 +
#* TAGM translation table
 +
#* Data corruption issue in the beginning of the run.
 +
#* rcdb event number issue.
 +
#* Monitoring anomaly observed by Alex:
 +
#** ST Timing: https://logbooks.jlab.org/entry/3752783
 +
#** normalization to amorphous run for beam monitoring in rootspy updated: https://logbooks.jlab.org/entry/3752755
 +
# Task for today
 +
#* Hall Work
 +
#** Relocate GEM/TRD
 +
#** Installing additional flash module (Sasha)
 +
#* Setting up high current test? (Sasha)
 +
#* TOF: Beni
 +
#* Profiler & FCal prototype: Ashark & Vlad
 +
#* Low current ~3nA run (1 hour)? (Sasha)
 +
# Plan for later
 +
#* Spin dance no longer scheduled
 +
#* Potential Hall C path change on Tuesday (Change GEM/TRD position again)
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3752719
 +
 +
 +
== Monday, Dec 16 at 08:45 ==
 +
# Weekend running:
 +
#* DIRC Gem data beam left configuration collected additional 6M trigger.
 +
#** Xenon gas test is included
 +
#** https://logbooks.jlab.org/entry/3754114
 +
#** https://logbooks.jlab.org/entry/3754118
 +
#* High rate trigger test completed
 +
#** Bottle neck: DIRC at 250-300 nA.
 +
#** Sasha is preparing a special trigger configuration
 +
#* DIRC commissioning data:
 +
#* Nominal configuration (Moroc threshold=100)~3B triggers
 +
#* Moroc threshold=50 ~ 2B trigger (this weekend)
 +
# Issues
 +
#* PS trigger (scalar) missing
 +
#* Root_spy crash
 +
#* Gluon05 monitor blinking issue
 +
#* DIRC reference signal still cant be used
 +
#* TAGM translation table
 +
#* Data corruption issue in the beginning of the run.
 +
#* DIRC issues:
 +
#** Missing tiles: https://logbooks.jlab.org/entry/3754151
 +
#** Anomaly DIRC occupancy: https://logbooks.jlab.org/entry/3753658
 +
#* Gluon04 desktop manager
 +
# Task for today
 +
#* Hall Work
 +
#** Relocate GEM/TRD to beam right position
 +
#** Installing additional flash module (Sasha)
 +
# Plan for later
 +
#* More test will be after Wednesday
 +
#** Current TAC run and TAGM accidental run.
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3754359
 +
 +
== Tuesday, Dec 17 at 08:45 ==
 +
# Weekend running:
 +
#* DIRC Gem/TRD moved to the beam right position collected 3M trigger.
 +
#** https://logbooks.jlab.org/entry/3755100
 +
#* More DIRC commissioning data at the nominal configuration is collected ~ 4B trigger
 +
#** A new equalized gain setting is used (changed 6:51am, Run 71112).
 +
#* BCAL flash module replace, and the old module is used on DIRC.
 +
#** https://logbooks.jlab.org/entry/3754502
 +
# Issues
 +
#* PS trigger (scalar) missing
 +
#** https://logbooks.jlab.org/entry/3755081
 +
#** https://logbooks.jlab.org/entry/3754439
 +
#* Data corruption issue in the beginning of the run.
 +
#* DIRC HV issue:
 +
#** https://logbooks.jlab.org/entry/3754537
 +
#* DIRC lower photon yield issue:
 +
#** https://logbooks.jlab.org/entry/3755056
 +
# Task for today
 +
#* DIRC HV channel swap
 +
#* 30 min Raw mode data for the flash electronics debugging
 +
#* TPOL firmware debugging
 +
# Plan for later
 +
#* Hall B beam path change tomorrow, beam intruption for 2 hours (starting 8am).
 +
#* More test will be after Wednesday
 +
#** Current TAC run and TAGM accidental run.
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3755074
 +
 +
== Wednesday, Dec 18 at 08:45 ==
 +
# Past 24 hours:
 +
#* DIRC Gem/TRD the beam right position completed collecting 6M trigger.
 +
#** Gem/TRD test is completed in full.
 +
#* Two out of four special DIRC configuration is completed.
 +
#* Progress on setting the high rate test triggers and DAQ, but not completed.
 +
#* Raw mode data 71133-71156: https://logbooks.jlab.org/entry/3755376
 +
#* TAGM is fixed: https://logbooks.jlab.org/entry/3755595
 +
# Issues
 +
#* root_spy: https://logbooks.jlab.org/entry/3755549
 +
#* Data corruption issue in the beginning of the run.
 +
# Task for today
 +
#* Completing setting up the high current test
 +
# Plan for later
 +
#* TAGM accidental run: 5am tomorrow.
 +
#* Current TAC run immediately follows.
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** Wave forms from Beni: https://logbooks.jlab.org/book/halld
 +
#** https://logbooks.jlab.org/entry/3755635

Latest revision as of 10:15, 19 December 2019

Thursday, Dec 12 at 08:45

  1. Last 24h:
  2. Issue:
    • DAQ crash
      • DAQ issues (of manifest variety)
    • DIRC reference signal found in the stand alone configuration
    • Alarms for FDC HV
    • TAGM translation table
    • Data corruption issue in the beginning of the run.
    • rcdb event number issue.
  3. Task for today
    • Setting up high current test (Sasha)
    • CPP test crash (Dave)
  4. Plan for later

Friday, Dec 13 at 08:45

  1. Last 24h:
    • DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
    • The CPP test (1 hour) run was completed
    • Overnight collected ~3 hours of DIRC commissioning data.
      • Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
    • 30 mins Raw mode data taken:
  2. Issues:
  3. Task for today
    • Hall Work
      • Relocate GEM/TRD
      • Installing additional flash module (Sasha)
    • Setting up high current test? (Sasha)
    • TOF: Beni
    • Profiler & FCal prototype: Ashark & Vlad
    • Low current ~3nA run (1 hour)? (Sasha)
  4. Plan for later


Monday, Dec 16 at 08:45

  1. Weekend running:
    • DIRC Gem data beam left configuration collected additional 6M trigger.
    • High rate trigger test completed
      • Bottle neck: DIRC at 250-300 nA.
      • Sasha is preparing a special trigger configuration
    • DIRC commissioning data:
    • Nominal configuration (Moroc threshold=100)~3B triggers
    • Moroc threshold=50 ~ 2B trigger (this weekend)
  2. Issues
  3. Task for today
    • Hall Work
      • Relocate GEM/TRD to beam right position
      • Installing additional flash module (Sasha)
  4. Plan for later

Tuesday, Dec 17 at 08:45

  1. Weekend running:
  2. Issues
  3. Task for today
    • DIRC HV channel swap
    • 30 min Raw mode data for the flash electronics debugging
    • TPOL firmware debugging
  4. Plan for later

Wednesday, Dec 18 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Task for today
    • Completing setting up the high current test
  4. Plan for later