Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Dec 5 at 08:45)
(Thursday, Dec 5 at 08:45)
Line 15: Line 15:
 
#* Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
 
#* Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
 
#* Sean got the general detector checkout done.   
 
#* Sean got the general detector checkout done.   
#* Trigger work by Sasha, for straight tracks w GEM and Richard's PS scans
+
#* Richard's uscope scans half done, interrupted by fake PSS button press from tagger hall
 +
#* Sasha setting up trigger config for straight tracks w GEM
 
#* MCC to start setting up hall A for RF stress testing tomorrow so trips expected during swing and owl
 
#* MCC to start setting up hall A for RF stress testing tomorrow so trips expected during swing and owl
#Issues?
+
#Issues
 +
#* Solenoid alarm
 +
#* PSS fault
 
# Plan for today
 
# Plan for today
 
#* Hope to collect enough straight tracks in GEM position 1 to move to 2 when Justin gives the okay, possibly at 6am
 
#* Hope to collect enough straight tracks in GEM position 1 to move to 2 when Justin gives the okay, possibly at 6am

Revision as of 22:34, 4 December 2019

<- Back to Run Coordination Meetings:Fall2019 Run

Thursday, Dec 5 at 08:45

  1. Last 24h:
    • Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
    • Sean got the general detector checkout done.
    • Richard's uscope scans half done, interrupted by fake PSS button press from tagger hall
    • Sasha setting up trigger config for straight tracks w GEM
    • MCC to start setting up hall A for RF stress testing tomorrow so trips expected during swing and owl
  2. Issues
    • Solenoid alarm
    • PSS fault
  3. Plan for today
    • Hope to collect enough straight tracks in GEM position 1 to move to 2 when Justin gives the okay, possibly at 6am
    • Move GEM to position 2, then take more data until ~4pm?
    • Move GEM to position 3, then take more data until ~6am Friday?
  4. Plan for later
  5. Notes from this meeting.