Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2019"

From GlueXWiki
Jump to: navigation, search
Line 34: Line 34:
 
#* Radiation levels report from Alexandre
 
#* Radiation levels report from Alexandre
 
#* Repeated alarms for TAGH 151
 
#* Repeated alarms for TAGH 151
 +
== Friday, Dec 6 at 08:45 ==
 +
# Last 24h:
 +
#* Collected enough straight track data for GEM at beam left, moved it to beam right during first access. 
 +
#* Other work done during access: FADC replaced on GEM/TRD.
 +
#* GEM/TRD firmware updated between beam left and beam right running
 +
#* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards]
 +
#Issues
 +
# Plan for today
 +
#* Ramp solenoid
 +
# Plan for later
 +
#* Spin dance likely Monday or Tuesday. We can have beam for some of this time.
 +
#* Diamond alignment on Wednesday?
 +
#Notes from this meeting.

Revision as of 16:19, 5 December 2019

<- Back to Run Coordination Meetings:Fall2019 Run

Thursday, Dec 5 at 08:45

  1. Last 24h:
    • Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
    • Sean got the general detector checkout done.
    • Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
    • Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
    • Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
    • Lubomir's logentry
  2. Issues
    • Solenoid alarm
    • PSS fault
    • GEM cable or module swap
  3. Plan for today
    • After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
    • Move GEM to position 3, then take more data until ~6am Friday?
  4. Plan for later
  5. Notes from this meeting.
    • Also need to check the GEM readout config
    • Beam time request from David for CPP
    • Radiation levels report from Alexandre
    • Repeated alarms for TAGH 151

Friday, Dec 6 at 08:45

  1. Last 24h:
  2. Issues
  3. Plan for today
    • Ramp solenoid
  4. Plan for later
    • Spin dance likely Monday or Tuesday. We can have beam for some of this time.
    • Diamond alignment on Wednesday?
  5. Notes from this meeting.