# Last 24h:
 
# Last 24h:
#* Collected enough straight track data for GEM at beam left, moved it to beam right during first access, then center.  
+
#* Now have enough straight track data for GEM at all 3 positions  
 
#* GEM_TRD firmware updated between beam left and beam right running
 
#* GEM_TRD firmware updated between beam left and beam right running
#* FADC replaced on GEM_TRD.  Readout issues with GEM_TRD (see Lubomir's logentry).   
+
#* FADC replaced on GEM_TRD.  Readout issues with GEM_TRD (see Lubomir's logentry).  
 +
#* Richard started completing the uscope threshold scan ~6am ish
 +
#* Solenoid should be ramping (Tim/Beni)  
 
#* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards]
 
#* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards]
 
#Issues
 
#Issues
 
#* [https://logbooks.jlab.org/entry/3747274 Lubomir's logentry, GEM_TRD]
 
#* [https://logbooks.jlab.org/entry/3747274 Lubomir's logentry, GEM_TRD]
#*[https://logbooks.jlab.org/entry/3747174 Beni, TOF]
+
#* [https://logbooks.jlab.org/entry/3747174 Beni, TOF]
 +
#* Rootspy (errors, preferred gluon, run #, plots)
 
#Reports
 
#Reports
 
#* [https://logbooks.jlab.org/entry/3747185 Tim, PS field]
 
#* [https://logbooks.jlab.org/entry/3747185 Tim, PS field]
 +
#* [https://logbooks.jlab.org/entry/3747551 Justin, DIRC LED]
 
# Plan for today  
 
# Plan for today  
#* Empty target, ramp solenoid while Richard does tagger accidentals measurement
+
#* Start solenoid ramping
 +
#* Empty target before Richard does tagger accidentals measurement
 
#* Fill target.  
 
#* Fill target.  
 
#* CDC & TOF scans
 
#* CDC & TOF scans
Line 53: Line 58:
 
# Plan for later  
 
# Plan for later  
 
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2019_Run#Runplan Alexandre's comprehensive runplan] now at #5
 
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2019_Run#Runplan Alexandre's comprehensive runplan] now at #5
#* Spin dance likely Monday or Tuesday. We can have beam for some of this time.
+
#* Spin dance likely Monday or Tuesday. We can have beam for some/most of this time.
#* Diamond alignment on Wednesday?
+
#* Diamond alignment likely on Wednesday?
 
#Notes from this meeting.
 
#Notes from this meeting.

Revision as of 08:28, 6 December 2019

<- Back to Run Coordination Meetings:Fall2019 Run

Thursday, Dec 5 at 08:45

  1. Last 24h:
    • Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
    • Sean got the general detector checkout done.
    • Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
    • Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
    • Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
    • Lubomir's logentry
  2. Issues
    • Solenoid alarm
    • PSS fault
    • GEM cable or module swap
  3. Plan for today
    • After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
    • Move GEM to position 3, then take more data until ~6am Friday?
  4. Plan for later
  5. Notes from this meeting.
    • Also need to check the GEM readout config
    • Beam time request from David for CPP
    • Radiation levels report from Alexandre
    • Repeated alarms for TAGH 151

Friday, Dec 6 at 08:45

  1. Last 24h:
    • Now have enough straight track data for GEM at all 3 positions
    • GEM_TRD firmware updated between beam left and beam right running
    • FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry).
    • Richard started completing the uscope threshold scan ~6am ish
    • Solenoid should be ramping (Tim/Beni)
    • Hovanes disabled the alarms on two TOF channels which have faulty HV boards
  2. Issues
  3. Reports
  4. Plan for today
    • Start solenoid ramping
    • Empty target before Richard does tagger accidentals measurement
    • Fill target.
    • CDC & TOF scans
    • DIRC commissioning field-on
    • Opp access request from Sasha 30 mins to replace fcal fadcs
  5. Plan for later
    • Alexandre's comprehensive runplan now at #5
    • Spin dance likely Monday or Tuesday. We can have beam for some/most of this time.
    • Diamond alignment likely on Wednesday?