(Friday, Dec 6 at 08:45)
Line 12: Line 12:
 
<!--  *[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] Comment -->
 
<!--  *[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] Comment -->
  
== Thursday, Dec 5 at 08:45 ==
 
# Last 24h:
 
#* Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
 
#* Sean got the general detector checkout done. 
 
#* Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
 
#* [https://logbooks.jlab.org/entry/3746828 Sasha set up trigger config for straight tracks] excluding uscope so Richard can work independently
 
#* Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
 
#* [https://logbooks.jlab.org/entry/3746870 Lubomir's logentry] 
 
#Issues
 
#* Solenoid alarm
 
#* PSS fault
 
#* GEM cable or module swap
 
# Plan for today
 
#* After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
 
#* Move GEM to position 3, then take more data until ~6am Friday?
 
# Plan for later
 
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2019_Run#Runplan Alexandre's comprehensive runplan] now at 3-4
 
#Notes from this meeting.
 
#* Also need to check the GEM readout config
 
#* Beam time request from David for CPP
 
#* Radiation levels report from Alexandre
 
#* Repeated alarms for TAGH 151
 
 
== Friday, Dec 6 at 08:45 ==
 
== Friday, Dec 6 at 08:45 ==
 
# Last 24h:
 
# Last 24h:
Line 69: Line 47:
 
#* try to reschedule tagger accidentals
 
#* try to reschedule tagger accidentals
 
#* No weekend meetings planned at present
 
#* No weekend meetings planned at present
 +
 +
== Thursday, Dec 5 at 08:45 ==
 +
# Last 24h:
 +
#* Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
 +
#* Sean got the general detector checkout done. 
 +
#* Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
 +
#* [https://logbooks.jlab.org/entry/3746828 Sasha set up trigger config for straight tracks] excluding uscope so Richard can work independently
 +
#* Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
 +
#* [https://logbooks.jlab.org/entry/3746870 Lubomir's logentry] 
 +
#Issues
 +
#* Solenoid alarm
 +
#* PSS fault
 +
#* GEM cable or module swap
 +
# Plan for today
 +
#* After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
 +
#* Move GEM to position 3, then take more data until ~6am Friday?
 +
# Plan for later
 +
#*  [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2019_Run#Runplan Alexandre's comprehensive runplan] now at 3-4
 +
#Notes from this meeting.
 +
#* Also need to check the GEM readout config
 +
#* Beam time request from David for CPP
 +
#* Radiation levels report from Alexandre
 +
#* Repeated alarms for TAGH 151

Revision as of 12:29, 6 December 2019

<- Back to Run Coordination Meetings:Fall2019 Run

Friday, Dec 6 at 08:45

  1. Last 24h:
    • Now have enough straight track data for GEM at all 3 positions
    • GEM_TRD firmware updated between beam left and beam right running
    • FADC replaced on GEM_TRD. Readout issues with GEM_TRD (see Lubomir's logentry).
    • Richard started completing the uscope threshold scan ~6am ish - working on this until 11am. Busy (UConn) until 5pm.
    • Solenoid is ramping (Tim/Beni)
    • Hovanes disabled the alarms on two TAGH channels which have faulty HV boards
  2. Issues
  3. Reports
  4. Plan for today
    • Start solenoid ramping
    • Access at ~11 or when Richard finishes uscope scan
    • (Empty target before Richard does tagger accidentals measurement) (postpone these)
    • Fill target.
    • CDC & TOF scans
    • DIRC commissioning field-on
    • Opp access request from Sasha 30 mins to replace fcal fadcs, Nick, Colin, Beni...
  5. Plan for later
    • Reschedule tagger accidentals
    • Alexandre's comprehensive runplan now at #5
    • Spin dance likely Monday or Tuesday. We can have beam for some/most of this time.
    • Diamond alignment likely on Wednesday?
  6. Notes from this meeting.
    • Access at 11 for work as above
    • Alignment on Saturday as stable beam most likely
    • uscope threshold scan top priority
    • DIRC commissioning can use amo if necessary
    • try to reschedule tagger accidentals
    • No weekend meetings planned at present

Thursday, Dec 5 at 08:45

  1. Last 24h:
    • Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
    • Sean got the general detector checkout done.
    • Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
    • Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
    • Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
    • Lubomir's logentry
  2. Issues
    • Solenoid alarm
    • PSS fault
    • GEM cable or module swap
  3. Plan for today
    • After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
    • Move GEM to position 3, then take more data until ~6am Friday?
  4. Plan for later
  5. Notes from this meeting.
    • Also need to check the GEM readout config
    • Beam time request from David for CPP
    • Radiation levels report from Alexandre
    • Repeated alarms for TAGH 151