(Created page with "=Thursday December 2= #Last 24h: #* #Issues: # Analysis update")
 
(Thursday December 2)
Line 1: Line 1:
 
=Thursday December 2=
 
=Thursday December 2=
 
#Last 24h:
 
#Last 24h:
#*  
+
#* Established beam last night before midnight.
 +
#* [https://logbooks.jlab.org/entry/3954438 Harp scan extrapolation looks to be focused a bit differently than before. PS rates seemed around 3.2kHz as before with 150nA beam so we kept this.]
 +
#* [https://logbooks.jlab.org/entry/3954564 Radiation levels at 50nA acceptable.]
 +
#* Continued production on C target at 150nA. Beam not available for most of Early Riser shift so far.
 
#Issues:
 
#Issues:
 +
#* Rates came back lower [https://logbooks.jlab.org/entry/3954661]
 +
#* Tagger magnet came back at slightly lower field [https://logbooks.jlab.org/entry/3954677]
 +
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 +
#* run on carbon at 150nA´
 +
#* Rotate the radiators and use both configurations
 +
##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)
 
# Analysis update
 
# Analysis update

Revision as of 08:57, 2 December 2021

Thursday December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [1]
    • Tagger magnet came back at slightly lower field [2]
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)
  4. Analysis update