Difference between revisions of "Run Planning Meeting Notes, December 2 - December 8, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday December 2)
(Thursday December 2)
Line 11: Line 11:
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´
 
#* Rotate the radiators and use both configurations
 
#* Rotate the radiators and use both configurations
##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)
+
##* Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
 
# Analysis update
 
# Analysis update

Revision as of 08:58, 2 December 2021

Thursday December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [1]
    • Tagger magnet came back at slightly lower field [2]
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update