(Thursday December 2)
(Thursday December 2)
Line 1: Line 1:
=Thursday December 2=
+
=Friday, December 3=
 +
#Last 24h:
 +
#*
 +
#Issues:
 +
#*
 +
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 +
#* run on carbon at 150nA´
 +
#* Rotate the radiators and use both configurations
 +
##* Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
 +
# Analysis update
 +
 
 +
=Thursday, December 2=
 
#Last 24h:
 
#Last 24h:
 
#* Established beam last night before midnight.  
 
#* Established beam last night before midnight.  

Revision as of 14:23, 2 December 2021

Friday, December 3

  1. Last 24h:
  2. Issues:
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update

Thursday, December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [1]
    • Tagger magnet came back at slightly lower field [2]. From meeting this morning "DC Power lowered HMax from 290 to 285A and supply cycled fine."
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update