Line 1: | Line 1: | ||
=Friday, December 3= | =Friday, December 3= | ||
#Last 24h: | #Last 24h: | ||
− | #* | + | #* Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [https://logbooks.jlab.org/entry/3954868],[https://logbooks.jlab.org/entry/3954875] |
+ | #* After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [https://logbooks.jlab.org/entry/3954921],[https://logbooks.jlab.org/entry/3954933] | ||
#Issues: | #Issues: | ||
− | #* | + | #* (not urgent but noted) Hall D staff need access to retrieve CPP equipment in the next week. |
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:] | # [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:] | ||
#* run on carbon at 150nA´ | #* run on carbon at 150nA´ |
Revision as of 15:42, 2 December 2021
Friday, December 3
- Last 24h:
- Issues:
- (not urgent but noted) Hall D staff need access to retrieve CPP equipment in the next week.
- Plan:
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
- Analysis update
Thursday, December 2
- Last 24h:
- Established beam last night before midnight.
- Harp scan extrapolation looks to be focused a bit differently than before. PS rates seemed around 3.2kHz as before with 150nA beam so we kept this.
- Radiation levels at 50nA acceptable.
- Continued production on C target at 150nA. Beam not available for most of Early Riser shift so far.
- Issues:
- Plan:
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
- Analysis update