#Last 24h:
 
#Last 24h:
#*  
+
#* Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [https://logbooks.jlab.org/entry/3954868],[https://logbooks.jlab.org/entry/3954875]
 +
#* After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [https://logbooks.jlab.org/entry/3954921],[https://logbooks.jlab.org/entry/3954933]
 
#Issues:
 
#Issues:
#*  
+
#* (not urgent but noted) Hall D staff need access to retrieve CPP equipment in the next week.
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´

Revision as of 15:42, 2 December 2021

Friday, December 3

  1. Last 24h:
    • Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [1],[2]
    • After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [3],[4]
  2. Issues:
    • (not urgent but noted) Hall D staff need access to retrieve CPP equipment in the next week.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update

Thursday, December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [5]
    • Tagger magnet came back at slightly lower field [6]. From meeting this morning "DC Power lowered HMax from 290 to 285A and supply cycled fine."
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update