Difference between revisions of "Run Planning Meeting Notes, December 2 - December 8, 2021"

From GlueXWiki
Jump to: navigation, search
(Saturday, December 4)
Line 1: Line 1:
 
=Saturday, December 4=
 
=Saturday, December 4=
 
#Last 24h:
 
#Last 24h:
#* Continued C production running.
+
#* Continued C production running. Took amorphous run yesterday evening, run 90382 [https://logbooks.jlab.org/entry/3955785]
 +
#* This morning had an issue with an FCAL FADC. Indication also from livetime at 5% [https://logbooks.jlab.org/entry/3956192], [https://logbooks.jlab.org/entry/3956224]. Sasha making a controlled access to possibly swap in a new FADC.
 
#Issues:
 
#Issues:
 
#* (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
 
#* (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
#* Need to coordinate with Chris and techs the changing of C target.
+
#* (to do) Coordinate with Chris and techs the changing of C target.
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´

Revision as of 11:22, 4 December 2021

Saturday, December 4

  1. Last 24h:
    • Continued C production running. Took amorphous run yesterday evening, run 90382 [1]
    • This morning had an issue with an FCAL FADC. Indication also from livetime at 5% [2], [3]. Sasha making a controlled access to possibly swap in a new FADC.
  2. Issues:
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.
  4. Analysis update

Friday, December 3

  1. Last 24h:
    • Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [4],[5]
    • After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [6],[7]
    • Hovanes performed collimator scan [8]
    • Continued C production running overnight.
  2. Issues:
    • FDC HV alarm overnight [9]
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • Need to coordinate with Chris and techs the changing of C target sometime next week.
    • Mark S. heard a strange repetitive banging sound in the Hall yesterday afternoon. By the time he made the access, it was gone.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.
  4. Analysis update

Thursday, December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [10]
    • Tagger magnet came back at slightly lower field [11]. From meeting this morning "DC Power lowered HMax from 290 to 285A and supply cycled fine."
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update