=Sunday, December 5=
 +
#Last 24h:
 +
#* Continued C production running. Pretty smooth running throughout the day and overnight.
 +
#Issues:
 +
#* (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
 +
#* (to do) Coordinate with Chris and techs the changing of C target.
 +
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 +
#* run on carbon at 150nA
 +
#* Rotate the radiators and use both configurations
 +
##* Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
 +
#* Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
 +
#* No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days. 
 +
 
=Saturday, December 4=
 
=Saturday, December 4=
 
#Last 24h:
 
#Last 24h:
Line 12: Line 25:
 
#* Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
 
#* Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
 
#* No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.   
 
#* No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.   
# Analysis update
 
  
 
=Friday, December 3=
 
=Friday, December 3=

Revision as of 10:32, 5 December 2021

Sunday, December 5

  1. Last 24h:
    • Continued C production running. Pretty smooth running throughout the day and overnight.
  2. Issues:
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.

Saturday, December 4

  1. Last 24h:
    • Continued C production running. Took amorphous run yesterday evening, run 90382 [1]
    • This morning had an issue with an FCAL FADC. Indication also from livetime at 5% [2], [3]. Sasha made a controlled access and swapped in a new FADC [4].
  2. Issues:
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.

Friday, December 3

  1. Last 24h:
    • Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [5],[6]
    • After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [7],[8]
    • Hovanes performed collimator scan [9]
    • Continued C production running overnight.
  2. Issues:
    • FDC HV alarm overnight [10]
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • Need to coordinate with Chris and techs the changing of C target sometime next week.
    • Mark S. heard a strange repetitive banging sound in the Hall yesterday afternoon. By the time he made the access, it was gone.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.
  4. Analysis update

Thursday, December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [11]
    • Tagger magnet came back at slightly lower field [12]. From meeting this morning "DC Power lowered HMax from 290 to 285A and supply cycled fine."
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update