Difference between revisions of "Run Planning Meeting Notes, December 2 - December 8, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, December 6)
(Monday, December 6)
Line 14: Line 14:
 
#* Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
 
#* Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
 
#* Take an amorphous run today
 
#* Take an amorphous run today
 +
#Analysis update
  
 
=Sunday, December 5=
 
=Sunday, December 5=

Revision as of 09:43, 6 December 2021

Monday, December 6

  1. Last 24h:
    • Continued C production running. Smooth during day and swing.
    • Alarms for TAGM1 and TAGM2 d/c from DAQ [1]. Sergey made an access to tagger hall after unable to remotely recycle the crates. Determined to be a network problem. Problem mysteriously cleared before IT on-call from off-site could arrive [2].
  2. Issues:
    • (urgent) Right Ar tank empty and cylinder needs replacement.
    • (urgent) Runs not being transferred fully from Hall D to central computing [3]
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • Take an amorphous run today
  4. Analysis update

Sunday, December 5

  1. Last 24h:
    • Continued C production running. Pretty smooth running throughout the day and overnight.
  2. Issues:
    • (urgent) Right Ar tank empty and cylinder needs replacement
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.

Saturday, December 4

  1. Last 24h:
    • Continued C production running. Took amorphous run yesterday evening, run 90382 [4]
    • This morning had an issue with an FCAL FADC. Indication also from livetime at 5% [5], [6]. Sasha made a controlled access and swapped in a new FADC [7].
  2. Issues:
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • (to do) Coordinate with Chris and techs the changing of C target.
  3. Plan:
    • run on carbon at 150nA
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.

Friday, December 3

  1. Last 24h:
    • Tried re-tuning the beam yesterday (reducing MQP5C11). Resulted in lower PS rates (~2.8 kHz) consistent with what was observed previously when we tried this. See: [8],[9]
    • After reverting to optics before the change, PS rates back up (~3.3 kHz). See: [10],[11]
    • Hovanes performed collimator scan [12]
    • Continued C production running overnight.
  2. Issues:
    • FDC HV alarm overnight [13]
    • (not urgent but noted) Hall D techs need access to retrieve CPP equipment in the next week.
    • Need to coordinate with Chris and techs the changing of C target sometime next week.
    • Mark S. heard a strange repetitive banging sound in the Hall yesterday afternoon. By the time he made the access, it was gone.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
    • Aligning the peak: Use coarse adjustment to align the distributions (red on blue) and then nudge/fine adjust to line up vertical line fit.
    • No Hall D RC meeting over the weekend. I will send updates by e-mail. Meeting with the PD at 9am both days.
  4. Analysis update

Thursday, December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [14]
    • Tagger magnet came back at slightly lower field [15]. From meeting this morning "DC Power lowered HMax from 290 to 285A and supply cycled fine."
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update