Run Planning Meeting Notes, December 2 - December 8, 2021

From GlueXWiki
Revision as of 08:58, 2 December 2021 by Hszumila (Talk | contribs) (Thursday December 2)

Jump to: navigation, search

Thursday December 2

  1. Last 24h:
  2. Issues:
    • Rates came back lower [1]
    • Tagger magnet came back at slightly lower field [2]
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • Stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145) ALWAYS ask MCC to insert the dumplette.
  4. Analysis update