Difference between revisions of "Run Planning Meeting Notes, Feb 06-Feb 12, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, February 6)
(Thursday, February 6)
Line 5: Line 5:
 
#* Production runs @ 350nA
 
#* Production runs @ 350nA
 
# Issues
 
# Issues
 +
#* DIRC temperature alarm (resolved, see: [https://logbooks.jlab.org/entry/3778666])
 +
#* Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
 
# Reports
 
# Reports
 
#* Harp scan results: [https://logbooks.jlab.org/entry/3778296 acc: 5C11],[https://logbooks.jlab.org/entry/3778297 acc: 5C11B], [https://logbooks.jlab.org/entry/3778309 Hall D: TAGH]
 
#* Harp scan results: [https://logbooks.jlab.org/entry/3778296 acc: 5C11],[https://logbooks.jlab.org/entry/3778297 acc: 5C11B], [https://logbooks.jlab.org/entry/3778309 Hall D: TAGH]
 +
#* Test of DIRC communication algorithm (see: [https://logbooks.jlab.org/entry/3778188])
 +
#* Missing optical links in DIRC (see: [https://logbooks.jlab.org/entry/3778193])
 
# Plans for today
 
# Plans for today

Revision as of 08:09, 6 February 2020

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
  2. Issues
    • DIRC temperature alarm (resolved, see: [1])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today