(Thursday, February 6)
(Thursday, February 6)
Line 4: Line 4:
 
#* Harp scans (see reports for details)
 
#* Harp scans (see reports for details)
 
#* Production runs @ 350nA
 
#* Production runs @ 350nA
 +
#* Collected 1.8B events
 
# Issues
 
# Issues
 
#* DIRC temperature alarm (resolved, see: [https://logbooks.jlab.org/entry/3778666])
 
#* DIRC temperature alarm (resolved, see: [https://logbooks.jlab.org/entry/3778666])
Line 12: Line 13:
 
#* Missing optical links in DIRC (see: [https://logbooks.jlab.org/entry/3778193])
 
#* Missing optical links in DIRC (see: [https://logbooks.jlab.org/entry/3778193])
 
# Plans for today
 
# Plans for today
 +
#* Production runs

Revision as of 09:31, 6 February 2020

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [1])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs