Difference between revisions of "Run Planning Meeting Notes, Feb 06-Feb 12, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, February 6)
(Thursday, February 6)
Line 1: Line 1:
 +
==  Friday, February 7 ==
 +
# Last 24 hours
 +
#* Production runs @350nA until 14:00
 +
#* Hovanes worked on diamond position for JD70-105 0/90 (see reports)
 +
#* Continued data taking until 18:15
 +
#* Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
 +
#* Accelerator crew was having network issues too
 +
# Issues
 +
#* DIRC cart leaking (see: [https://logbooks.jlab.org/entry/3779122])
 +
#* Problems with 1L12 and 2L24 (see: [https://logbooks.jlab.org/files/2020/02/3779188/Screenshot%20from%202020-02-07%2004-06-43.png])
 +
#* Accelerator site having problems with IOCs in alarm handler (see: [https://cebaf.jlab.org/dtm/open-events?event_id=6073])
 +
# Reports
 +
#* New diamond position for JD70-105 0/90 (see: [https://logbooks.jlab.org/entry/3778980],[https://logbooks.jlab.org/entry/3779032])
 +
#* Communication problems with rocDIRC (see: [https://logbooks.jlab.org/entry/3779047],[https://logbooks.jlab.org/entry/3779095],[https://logbooks.jlab.org/entry/3779158])
 +
#* Network problems on accelerator site (see: [https://logbooks.jlab.org/entry/3779159],[https://logbooks.jlab.org/entry/3779161])
 +
# Plans for today
 +
#* Production runs
 +
 
==  Thursday, February 6 ==  
 
==  Thursday, February 6 ==  
 
# Last 24 hours
 
# Last 24 hours

Revision as of 08:07, 7 February 2020

Friday, February 7

  1. Last 24 hours
    • Production runs @350nA until 14:00
    • Hovanes worked on diamond position for JD70-105 0/90 (see reports)
    • Continued data taking until 18:15
    • Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
    • Accelerator crew was having network issues too
  2. Issues
    • DIRC cart leaking (see: [1])
    • Problems with 1L12 and 2L24 (see: [2])
    • Accelerator site having problems with IOCs in alarm handler (see: [3])
  3. Reports
    • New diamond position for JD70-105 0/90 (see: [4],[5])
    • Communication problems with rocDIRC (see: [6],[7],[8])
    • Network problems on accelerator site (see: [9],[10])
  4. Plans for today
    • Production runs

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [11])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs