Difference between revisions of "Run Planning Meeting Notes, Feb 06-Feb 12, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, February 6)
(Friday, February 7)
Line 6: Line 6:
 
#* Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
 
#* Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
 
#* Accelerator crew was having network issues too
 
#* Accelerator crew was having network issues too
 +
#* Hall went into beam permit around 1:15am
 +
#* Accelerator crew having trouble with control system (see issues)
 
# Issues
 
# Issues
 
#* DIRC cart leaking (see: [https://logbooks.jlab.org/entry/3779122])
 
#* DIRC cart leaking (see: [https://logbooks.jlab.org/entry/3779122])

Revision as of 08:16, 7 February 2020

Friday, February 7

  1. Last 24 hours
    • Production runs @350nA until 14:00
    • Hovanes worked on diamond position for JD70-105 0/90 (see reports)
    • Continued data taking until 18:15
    • Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
    • Accelerator crew was having network issues too
    • Hall went into beam permit around 1:15am
    • Accelerator crew having trouble with control system (see issues)
  2. Issues
    • DIRC cart leaking (see: [1])
    • Problems with 1L12 and 2L24 (see: [2])
    • Accelerator site having problems with IOCs in alarm handler (see: [3])
  3. Reports
    • New diamond position for JD70-105 0/90 (see: [4],[5])
    • Communication problems with rocDIRC (see: [6],[7],[8])
    • Network problems on accelerator site (see: [9],[10])
  4. Plans for today
    • Production runs

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [11])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs