(Friday, February 7)
(Friday, February 7)
Line 20: Line 20:
 
#* Access to hall ?
 
#* Access to hall ?
 
# Plan(s) for next week
 
# Plan(s) for next week
#* Monday: Hall A will change setup for pol. meas. -> No beam from ~ 8:00 on
+
#* Monday: Hall A will change setup for pol. meas. -> No beam from ~ 8:00 on (see: [https://cebaf.jlab.org/files/ops/accboard/])
 +
# No meeting this weekend -> Next meeting: Monday, Feb 10
  
 
==  Thursday, February 6 ==  
 
==  Thursday, February 6 ==  

Revision as of 10:29, 7 February 2020

Friday, February 7

  1. Last 24 hours
    • Production runs @350nA until 14:00
    • Hovanes worked on diamond position for JD70-105 0/90 (see reports)
    • Continued data taking until 18:15
    • Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
    • Accelerator crew was having network issues too
    • Hall went into beam permit around 1:15am
    • Accelerator crew having trouble with control system (see issues)
  2. Issues
    • DIRC cart leaking (see: [1])
    • Problems with 1L12 and 2L24 (see: [2])
    • Accelerator site having problems with IOCs in alarm handler (see: [3])
  3. Reports
    • New diamond position for JD70-105 0/90 (see: [4],[5])
    • Communication problems with rocDIRC (see: [6],[7],[8])
    • Network problems on accelerator site (see: [9],[10])
  4. Plans for today
    • Production runs
    • Access to hall ?
  5. Plan(s) for next week
    • Monday: Hall A will change setup for pol. meas. -> No beam from ~ 8:00 on (see: [11])
  6. No meeting this weekend -> Next meeting: Monday, Feb 10

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [12])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs