(Monday, February 10)
Line 1: Line 1:
 +
==  Tuesday, February 11 ==
 +
# Last 24 hours
 +
#* Beam taken away at 08:30
 +
#** Work in hall
 +
#** Walkthrough
 +
#* Beam was availabe at 12:30
 +
# Issues
 +
# Reports
 +
# Plans for today
 +
#* Harp scans
 +
#* Production runs
 +
 
==  Monday, February 10 ==
 
==  Monday, February 10 ==
 
# Last 72 hours
 
# Last 72 hours

Revision as of 18:50, 10 February 2020

Tuesday, February 11

  1. Last 24 hours
    • Beam taken away at 08:30
      • Work in hall
      • Walkthrough
    • Beam was availabe at 12:30
  2. Issues
  3. Reports
  4. Plans for today
    • Harp scans
    • Production runs

Monday, February 10

  1. Last 72 hours
    • Friday
      • Beam sent to hall around 08:30
      • Harp scans
      • Prodcution runs @350nA until 23:50 -> no beam until the next morning
    • Saturday
      • Beam sent to hall around 12:00
      • Harp scans (requested by MCC)
      • Prodcution runs @350nA
      • Found high rates in high photon tagger counter (see issues)
      • Had to request beam tune -> Unusal tagger rates + ION chamber trips (see: [1])
    • Sunday
      • Prodcution runs @350nA
      • Harp scans
    • Collected ~6.5B evts over the weekend
  2. Issues
  3. Reports
  4. Plans for today
    • Beam off, starting 08:30
    • Continue production runs once beam is back

Friday, February 7

  1. Last 24 hours
    • Production runs @350nA until 14:00
    • Hovanes worked on diamond position for JD70-105 0/90 (see reports)
    • Continued data taking until 18:15
    • Connection issues with rocDIRC -> Bill, Sergey and network expert on call had to work until late night to fix the problem
    • Accelerator crew was having network issues too
    • Hall went into beam permit around 1:15am
    • Accelerator crew having trouble with control system (see issues)
  2. Issues
    • DIRC cart leaking (see: [9])
    • Problems with 1L12 and 2L24 (see: [10])
    • Accelerator site having problems with IOCs in alarm handler (see: [11])
  3. Reports
    • New diamond position for JD70-105 0/90 (see: [12],[13])
    • Communication problems with rocDIRC (see: [14],[15],[16])
    • Network problems on accelerator site (see: [17],[18])
  4. Plans for today
    • Production runs
    • Access to hall ?
  5. Plan(s) for next week
    • Monday: Hall A will change setup for pol. meas. -> No beam from ~ 8:00 on (see: [19])
  6. No meeting this weekend -> Next meeting: Monday, Feb 10

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [20])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs