Run Planning Meeting Notes, Feb 06-Feb 12, 2020

From GlueXWiki
Revision as of 09:31, 6 February 2020 by Dlersch (Talk | contribs) (Thursday, February 6)

Jump to: navigation, search

Thursday, February 6

  1. Last 24 hours
    • Beam was sent to hall at 19:51
    • Harp scans (see reports for details)
    • Production runs @ 350nA
    • Collected 1.8B events
  2. Issues
    • DIRC temperature alarm (resolved, see: [1])
    • Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
  3. Reports
  4. Plans for today
    • Production runs