Difference between revisions of "Run Planning Meeting Notes, Feb 20-Feb 26, 2020"
From GlueXWiki
(→Friday, February 20) |
(→Friday, February 20) |
||
Line 15: | Line 15: | ||
#* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips] | #* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips] | ||
# Reports | # Reports | ||
− | #* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335] BCAL gains have changed after the incident - Mark | + | #* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark |
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does] | #* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does] | ||
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin | #* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin |
Revision as of 20:14, 20 February 2020
Thursday, February 20
- Last 24 hours
- Smooth production running (18hrs/24hrs with beam)
- Reports
- Run Plan
- Production running
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
Friday, February 20
- Last 24 hours
- Production Running
- MCC adjusted AD00 due to BLM trips
- Reports
- [1], [2], [3] BCAL gains and temperature have changed after the incident - Mark
- Convergence looks as it usually does
- PS enhancement after beam spot move-Justin
- Run Plan
- Production running
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.