Difference between revisions of "Run Planning Meeting Notes, Feb 20-Feb 26, 2020"
From GlueXWiki
(→Friday, February 20) |
(→Friday, February 20) |
||
Line 13: | Line 13: | ||
# Last 24 hours | # Last 24 hours | ||
#* Production Running | #* Production Running | ||
− | #* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips] | + | #* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips without informing us] |
# Reports | # Reports | ||
#* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark | #* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark | ||
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does] | #* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does] | ||
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin | #* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin | ||
+ | #* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm] | ||
# Run Plan | # Run Plan | ||
#* Production running | #* Production running | ||
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam. | #* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam. |
Revision as of 08:07, 21 February 2020
Thursday, February 20
- Last 24 hours
- Smooth production running (18hrs/24hrs with beam)
- Reports
- Run Plan
- Production running
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
Friday, February 20
- Last 24 hours
- Production Running
- MCC adjusted AD00 due to BLM trips without informing us
- Reports
- [1], [2], [3] BCAL gains and temperature have changed after the incident - Mark
- Convergence looks as it usually does
- PS enhancement after beam spot move-Justin
- DIRC Tile Temperature alarm
- Run Plan
- Production running
- Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.