(Thursday, February 27)
(Thursday, February 27)
Line 10: Line 10:
 
#* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445] [https://logbooks.jlab.org/entry/3792450]
 
#* DIRC LV regulation issue: [https://logbooks.jlab.org/entry/3792445] [https://logbooks.jlab.org/entry/3792450]
 
#** Conclusion: adding LV regulation to the DIRC todo list.  
 
#** Conclusion: adding LV regulation to the DIRC todo list.  
 +
#* [https://logbooks.jlab.org/entry/3793084 Transmission issue]
 
# Run Plan
 
# Run Plan
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* Production
 
#* Production
# Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.
+
#* Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Revision as of 09:45, 27 February 2020

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.