Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, February 28)
(Friday, February 28)
Line 22: Line 22:
 
#* Production till 11pm with 350nA, then 250nA
 
#* Production till 11pm with 350nA, then 250nA
 
#* No beam overnight
 
#* No beam overnight
 
 
# Reports/Issues
 
# Reports/Issues
 
#* [https://logbooks.jlab.org/entry/3793724 Rate and ratios]
 
#* [https://logbooks.jlab.org/entry/3793724 Rate and ratios]
 
#* root_spy crashes when started on Gluon03: [https://logbooks.jlab.org/entry/3793251] [https://logbooks.jlab.org/entry/3793712]
 
#* root_spy crashes when started on Gluon03: [https://logbooks.jlab.org/entry/3793251] [https://logbooks.jlab.org/entry/3793712]
 
#* DIRC temperature/communication error [https://logbooks.jlab.org/entry/3793238]
 
#* DIRC temperature/communication error [https://logbooks.jlab.org/entry/3793238]
 
+
#* Monitoring issue: [https://logbooks.jlab.org/entry/3793304 Low phi,rho,omega yields] [https://logbooks.jlab.org/entry/3793325 FCAL timing difference for run 71933 and 71934]
 
# Run Plan
 
# Run Plan
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* Production
 
#* Production

Revision as of 09:33, 28 February 2020

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm. [1]
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[2]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
    • Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Friday, February 28

  1. Last 24 hours
    • Harp and Collimator scan (before :11:30am). Convergence Collimator scan
    • Request to change collomator position by Hovanes at 4:30pm [5]
    • Production till 11pm with 350nA, then 250nA
    • No beam overnight
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production