Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Wednesday, February 26 == # Last 24 hours #*Access during accelerator maintenance (8:30-"12:30". Actual recovery happened at 18:00): #**Colin turned on PDU for FCAL. #*...")
 
(Wednesday, February 26)
Line 1: Line 1:
 
==  Wednesday, February 26 ==  
 
==  Wednesday, February 26 ==  
 
# Last 24 hours
 
# Last 24 hours
#*Access during accelerator maintenance (8:30-"12:30". Actual recovery happened at 18:00):
+
#* tripy beam afternoon-10pm
#**Colin turned on PDU for FCAL.
+
#* No beam 11:00 pm - 7:00 am
#**Scott and Mark reset Chimney 4 cold cathode gauge.
+
#**Sergei installed new radiators for the TRD.
+
#**Raw mode runs taken (RAW_ALL_NOSPARS or RAW_ALL_NOSPARS_NEW)
+
#* Production running
+
 
# Reports/Issues
 
# Reports/Issues
#*RC Colin Gleason was diagnosed with flu: AD is acting RC.
+
#*
#*[https://logbooks.jlab.org/entry/3791657 DIRC alarms], [https://logbooks.jlab.org/entry/3791750 fixed by Bill]
+
 
#*Alcohol level in top bubbler topped off.
+
#*[https://logbooks.jlab.org/entry/3791827 NMR probed for tagger had stopped working without alarm]
+
#*[https://logbooks.jlab.org/entry/3791822 ComCal humidity is rising.]
+
 
# Run Plan
 
# Run Plan
 
#* Production
 
#* Production
#* No beam nor access 9am-12pm today due to MCC safety meeting. SSO will be manned but only for emergency:
+
#* No beam 8am-10am , Hall B beam restoration software reset.
#**From Director of Operations C. Ginsburg: "Most of accelerator division will be in meetings during that time.  No accelerator work will be allowed: no beam, no accesses, no repairs, no work in the test lab, etc.  We will have one SSO on shift and one crew chief on-call.  Experimenters shall not have accesses.  In case of human emergency, please call 911 as usual.  In case of equipment emergency (fire, helium plume, etc.), please call the SSO and we will address the problem as appropriate.  RadCon is not affected by our stand down."
+

Revision as of 09:23, 27 February 2020

Wednesday, February 26

  1. Last 24 hours
    • tripy beam afternoon-10pm
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  1. Run Plan
    • Production
    • No beam 8am-10am , Hall B beam restoration software reset.