Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, January 23 at 08:45)
(Thursday, January 23 at 08:45)
Line 5: Line 5:
 
== Thursday, January 23 at 08:45 ==  
 
== Thursday, January 23 at 08:45 ==  
 
# Last 24 hours
 
# Last 24 hours
#* Various accelerator problems: Arc PS, Injector, Cavity HV
+
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576]
 
#* Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean)
 
#* Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean)
 
# Issues
 
# Issues

Revision as of 17:47, 22 January 2020

Trigger Spreadsheet

Trigger Counter

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [1]
    • Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean)
  2. Issues
  3. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
  4. Plan for later
    • SC Trigger?