Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"
From GlueXWiki
(→Thursday, January 23 at 08:45) |
(→Thursday, January 23 at 08:45) |
||
Line 7: | Line 7: | ||
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576] | #* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576] | ||
#* Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean) | #* Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean) | ||
+ | #* Harp Scan | ||
+ | #* Continue production with 250nA beam current | ||
# Issues | # Issues | ||
#* Timing shifts after firmware update: [https://logbooks.jlab.org/entry/3768620] | #* Timing shifts after firmware update: [https://logbooks.jlab.org/entry/3768620] |
Revision as of 22:00, 22 January 2020
Thursday, January 23 at 08:45
- Last 24 hours
- Various accelerator problems: Arc PS, Injector, Cavity HV [1]
- Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean)
- Harp Scan
- Continue production with 250nA beam current
- Issues
- Timing shifts after firmware update: [2]
- PS Timing Window?
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Plan for later
- SC Trigger?