Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, January 23 at 08:45)
(Thursday, January 23 at 08:45)
Line 6: Line 6:
 
# Last 24 hours
 
# Last 24 hours
 
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576]
 
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576]
#* Check-out of PS, TagM, TagH, SC firmware (Sasha, Sean)
+
#* Check-out of PS, TagM, TagH after timing window shift [https://logbooks.jlab.org/entry/3768077]
 
#* Harp Scan
 
#* Harp Scan
 
#* Continue production with 250nA beam current
 
#* Continue production with 250nA beam current

Revision as of 22:04, 22 January 2020

Trigger Spreadsheet

Trigger Counter

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [1]
    • Check-out of PS, TagM, TagH after timing window shift [2]
    • Harp Scan
    • Continue production with 250nA beam current
  2. Issues
    • Timing shifts after firmware update: [3]
    • PS Timing Window? [4]
  3. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
  4. Plan for later
    • SC Trigger?