(Thursday, January 23 at 08:45)
(Thursday, January 23 at 08:45)
Line 6: Line 6:
 
# Last 24 hours
 
# Last 24 hours
 
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576]
 
#* Various accelerator problems: Arc PS, Injector, Cavity HV [https://logbooks.jlab.org/entry/3768576]
#* Check-out of PS, TagM, TagH, ST after timing window shift [https://logbooks.jlab.org/entry/3768077]
+
#* Check-out of PS, TagM, TagH, ST after timing window shift [https://logbooks.jlab.org/entry/3768077], [https://logbooks.jlab.org/entry/3768695]
 
#* Harp Scan [https://logbooks.jlab.org/entry/3768676]
 
#* Harp Scan [https://logbooks.jlab.org/entry/3768676]
 
#* Continue production with 250nA beam current
 
#* Continue production with 250nA beam current
 
# Issues
 
# Issues
 
#* Timing shifts after firmware update: [https://logbooks.jlab.org/entry/3768620]
 
#* Timing shifts after firmware update: [https://logbooks.jlab.org/entry/3768620]
#* PS Timing Window? [https://logbooks.jlab.org/entry/3768090]
+
#* PS Timing Window? [https://logbooks.jlab.org/entry/3768090], [https://logbooks.jlab.org/entry/3768695]
 +
#* CDC inner region [https://logbooks.jlab.org/entry/3768687]
 
# Tasks for today
 
# Tasks for today
 
#* Production
 
#* Production

Revision as of 23:14, 22 January 2020

Trigger Spreadsheet

Trigger Counter

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [1]
    • Check-out of PS, TagM, TagH, ST after timing window shift [2], [3]
    • Harp Scan [4]
    • Continue production with 250nA beam current
  2. Issues
    • Timing shifts after firmware update: [5]
    • PS Timing Window? [6], [7]
    • CDC inner region [8]
  3. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
  4. Plan for later
    • SC Trigger?