Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Thursday, January 23 at 08:45)
(Thursday, January 23 at 08:45)
Line 13: Line 13:
 
#* PS Timing Window? [https://logbooks.jlab.org/entry/3768090], [https://logbooks.jlab.org/entry/3768695]
 
#* PS Timing Window? [https://logbooks.jlab.org/entry/3768090], [https://logbooks.jlab.org/entry/3768695]
 
#* CDC inner region [https://logbooks.jlab.org/entry/3768687], [https://logbooks.jlab.org/entry/3768705]
 
#* CDC inner region [https://logbooks.jlab.org/entry/3768687], [https://logbooks.jlab.org/entry/3768705]
 +
#* DIRC@Rootspy glitches [https://logbooks.jlab.org/entry/3768792],[https://logbooks.jlab.org/entry/3768823]
 +
#* Frozen PS rates [https://logbooks.jlab.org/entry/3768877]
 
# Tasks for today
 
# Tasks for today
 
#* Production
 
#* Production

Revision as of 07:54, 23 January 2020

Trigger Spreadsheet

Trigger Counter

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [1]
    • Check-out of PS, TagM, TagH, ST after timing window shift [2], [3]
    • Harp Scan [4]
    • Continue production with 250nA beam current
  2. Issues
    • Timing shifts after firmware update: [5]
    • PS Timing Window? [6], [7]
    • CDC inner region [8], [9]
    • DIRC@Rootspy glitches [10],[11]
    • Frozen PS rates [12]
  3. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
  4. Plan for later
    • SC Trigger?