Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, January 24 at 08:45)
(Friday, January 24 at 08:45)
Line 5: Line 5:
 
== Friday, January 24 at 08:45 ==  
 
== Friday, January 24 at 08:45 ==  
 
# Last 24 hours
 
# Last 24 hours
#* Continue production with 250nA beam current
+
#* Production with 250nA beam current
 +
#* [https://logbooks.jlab.org/entry/3769591 Beam current and position]
 
# Issues
 
# Issues
 
#* Frozen total PS/FCal rates fixed (Hovanes)
 
#* Frozen total PS/FCal rates fixed (Hovanes)
#* Update reference plots!
+
#* [https://logbooks.jlab.org/entry/3769462 Goniometer image]
 
# Reports:
 
# Reports:
 
#* Updated sigmas for harp fitting tool [https://logbooks.jlab.org/entry/3768981]
 
#* Updated sigmas for harp fitting tool [https://logbooks.jlab.org/entry/3768981]
# Tasks for the weekend
+
#* [https://logbooks.jlab.org/entry/3769629 Monitoring Plots]
 +
# Tasks for the today and the weekend:
 +
#* Empty target run after the meeting
 +
#* PS Timing Studies (Friday)?
 
#* Production
 
#* Production
#* CCAL anode study?
+
#* CCAL anode study (Saturday)?
 
# Monday:
 
# Monday:
 
#* Increase beam current to 350nA
 
#* Increase beam current to 350nA

Revision as of 09:29, 24 January 2020

Trigger Spreadsheet

Trigger Counter

Friday, January 24 at 08:45

  1. Last 24 hours
  2. Issues
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [2]
    • Check-out of PS, TagM, TagH, ST after timing window shift [3], [4]
    • Harp Scan [5]
    • Continue production with 250nA beam current
  2. Issues
    • Timing shifts after firmware update: [6]
    • PS Timing Window? [7], [8]
    • CDC inner region [9], [10]
    • DIRC@Rootspy glitches [11],[12]
    • Frozen PS/Main trigger rates [13], [14]
    • Update reference plots! [15], [16]
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?