Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, January 24 at 08:45)
(Friday, January 24 at 08:45)
Line 6: Line 6:
 
# Last 24 hours
 
# Last 24 hours
 
#* Production with 250nA beam current
 
#* Production with 250nA beam current
#* Beam current and position [[https://logbooks.jlab.org/entry/3769591], [https://logbooks.jlab.org/entry/3769669]
+
#* Beam current and position [https://logbooks.jlab.org/entry/3769591], [https://logbooks.jlab.org/entry/3769669]
 
# Issues
 
# Issues
 
#* Frozen total PS/FCal rates fixed (Hovanes)
 
#* Frozen total PS/FCal rates fixed (Hovanes)

Revision as of 09:33, 24 January 2020

Trigger Spreadsheet

Trigger Counter

Friday, January 24 at 08:45

  1. Last 24 hours
    • Production with 250nA beam current
    • Beam current and position [1], [2]
  2. Issues
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [4]
    • Check-out of PS, TagM, TagH, ST after timing window shift [5], [6]
    • Harp Scan [7]
    • Continue production with 250nA beam current
  2. Issues
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?