Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"
From GlueXWiki
(→Friday, January 24 at 08:45) |
|||
Line 2: | Line 2: | ||
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Trigger Counter] | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Trigger Counter] | ||
+ | |||
+ | == Monday, January 24 at 08:45 == | ||
+ | # Last 72 hours | ||
+ | #* Mostly Production with 250nA beam current | ||
+ | #* Empty target runs with 250nA (71533) and 350nA (71532) | ||
+ | # Issues | ||
+ | # Reports | ||
+ | # Tasks for the today | ||
+ | #* Increase beam current to 350nA | ||
+ | #** Switch off low-energy TagH counters (new EPICS configuration file) | ||
== Friday, January 24 at 08:45 == | == Friday, January 24 at 08:45 == |
Revision as of 15:52, 24 January 2020
Monday, January 24 at 08:45
- Last 72 hours
- Mostly Production with 250nA beam current
- Empty target runs with 250nA (71533) and 350nA (71532)
- Issues
- Reports
- Tasks for the today
- Increase beam current to 350nA
- Switch off low-energy TagH counters (new EPICS configuration file)
- Increase beam current to 350nA
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [3]
- Reports:
- Updated sigmas for harp fitting tool [4]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [20]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?