Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, January 24 at 08:45)
(Monday, January 24 at 08:45)
Line 15: Line 15:
 
# Reports
 
# Reports
 
#* Rates: [https://logbooks.jlab.org/entry/3771890]
 
#* Rates: [https://logbooks.jlab.org/entry/3771890]
 +
#* Energy: [https://logbooks.jlab.org/entry/3771948]
 
#* TPOL Reference and Converter [https://logbooks.jlab.org/entry/3770801]
 
#* TPOL Reference and Converter [https://logbooks.jlab.org/entry/3770801]
 
# Tasks for the today
 
# Tasks for the today

Revision as of 09:45, 27 January 2020

Trigger Spreadsheet

Trigger Counter

Monday, January 24 at 08:45

  1. Last 72 hours
    • Mostly Production with 250nA beam current
    • Empty target runs with 250nA (71533) and 350nA (71532) on Friday
    • Harp Scan on Sunday [1]
    • CCal Anode Tests on Sunday evening (Sasha) [2]
  2. Issues
  3. Reports
    • Rates: [7]
    • Energy: [8]
    • TPOL Reference and Converter [9]
  4. Tasks for the today
    • Increase beam current to 350nA
      • Switch off low-energy TagH counters (new EPICS configuration file) [10]
    • No beam study / RF recovery planned
    • Diamond alignment later this week

Friday, January 24 at 08:45

  1. Last 24 hours
    • Production with 250nA beam current
    • Beam current and position [11], [12]
  2. Issues
    • Frozen total PS/FCal rates fixed (Hovanes)
    • Goniometer image missing [13]
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting if beam is taken away
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [15]
    • Check-out of PS, TagM, TagH, ST after timing window shift [16], [17]
    • Harp Scan [18]
    • Continue production with 250nA beam current
  2. Issues
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?