Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"
From GlueXWiki
(→Monday, January 24 at 08:45) |
(→Monday, January 24 at 08:45) |
||
Line 15: | Line 15: | ||
# Reports | # Reports | ||
#* Rates: [https://logbooks.jlab.org/entry/3771890] | #* Rates: [https://logbooks.jlab.org/entry/3771890] | ||
+ | #* Energy: [https://logbooks.jlab.org/entry/3771948] | ||
#* TPOL Reference and Converter [https://logbooks.jlab.org/entry/3770801] | #* TPOL Reference and Converter [https://logbooks.jlab.org/entry/3770801] | ||
# Tasks for the today | # Tasks for the today |
Revision as of 09:45, 27 January 2020
Monday, January 24 at 08:45
- Last 72 hours
- Issues
- Reports
- Tasks for the today
- Increase beam current to 350nA
- Switch off low-energy TagH counters (new EPICS configuration file) [10]
- No beam study / RF recovery planned
- Diamond alignment later this week
- Increase beam current to 350nA
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [13]
- Reports:
- Updated sigmas for harp fitting tool [14]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [30]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?