Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"

From GlueXWiki
Jump to: navigation, search
(Tuesday, January 25 at 08:45)
(Tuesday, January 25 at 08:45)
Line 6: Line 6:
 
# Last 24 hours
 
# Last 24 hours
 
#* First day of production with 350nA beam current!
 
#* First day of production with 350nA beam current!
#* 11:30 Solenoid trip [https://logbooks.jlab.org/entry/3772377]
+
#* PS timing window reduced [https://logbooks.jlab.org/entry/3772296]
 +
#* 11:30 Solenoid trip [https://logbooks.jlab.org/entry/3772384], [https://logbooks.jlab.org/entry/3772377], [https://logbooks.jlab.org/entry/3772407], recovered after reset of cryo compressor
 +
#* 03:50 Solenoid trip [https://logbooks.jlab.org/entry/3772444], [https://logbooks.jlab.org/entry/3772466], instability on power supply, investigation  ongoing
 +
#* Issues with chopper → almost no beam loss
 
# Issues
 
# Issues
 
#* TOF point disappearance after window shift [https://logbooks.jlab.org/entry/3772058], [https://logbooks.jlab.org/entry/3772122]
 
#* TOF point disappearance after window shift [https://logbooks.jlab.org/entry/3772058], [https://logbooks.jlab.org/entry/3772122]
Line 12: Line 15:
 
#* Event size increase due to CCal [https://logbooks.jlab.org/entry/3772097]
 
#* Event size increase due to CCal [https://logbooks.jlab.org/entry/3772097]
 
# Reports
 
# Reports
#* Trigger rates and dead time
+
#* Rates  [https://logbooks.jlab.org/entry/3772535] (Alexandre)
 +
#* Trigger rates and dead time at 350nA [https://logbooks.jlab.org/entry/3772277] (Sasha)
 +
#* PS multiplicity and timing [https://logbooks.jlab.org/entry/3772283] (Sasha)
 
# Plans for today
 
# Plans for today
#* No beam study / RF recovery planned
+
#* Work on RF instability (~hours) [https://logbooks.jlab.org/entry/3772585]
#* Diamond alignment later this week
+
#* Start diamond alignment afterwards
  
 
== Monday, January 24 at 08:45 ==  
 
== Monday, January 24 at 08:45 ==  

Revision as of 09:33, 28 January 2020

Trigger Spreadsheet

Trigger Counter

Tuesday, January 25 at 08:45

  1. Last 24 hours
    • First day of production with 350nA beam current!
    • PS timing window reduced [1]
    • 11:30 Solenoid trip [2], [3], [4], recovered after reset of cryo compressor
    • 03:50 Solenoid trip [5], [6], instability on power supply, investigation ongoing
    • Issues with chopper → almost no beam loss
  2. Issues
    • TOF point disappearance after window shift [7], [8]
    • Missing DIRC blocks [9]
    • Event size increase due to CCal [10]
  3. Reports
    • Rates [11] (Alexandre)
    • Trigger rates and dead time at 350nA [12] (Sasha)
    • PS multiplicity and timing [13] (Sasha)
  4. Plans for today
    • Work on RF instability (~hours) [14]
    • Start diamond alignment afterwards

Monday, January 24 at 08:45

  1. Last 72 hours
    • Mostly Production with 250nA beam current
    • Empty target runs with 250nA (71533) and 350nA (71532) on Friday
    • Harp Scan on Sunday [15]
    • CCal Anode Tests on Sunday evening (Sasha) [16]
  2. Issues
  3. Reports
  4. Tasks for the today
    • Increase beam current to 350nA
      • Switch off low-energy TagH counters (new EPICS configuration file) [24]
    • No beam study / RF recovery planned
    • Diamond alignment later this week

Friday, January 24 at 08:45

  1. Last 24 hours
    • Production with 250nA beam current
    • Beam current and position [25], [26]
  2. Issues
    • Frozen total PS/FCal rates fixed (Hovanes)
    • Goniometer image missing [27]
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting if beam is taken away
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [29]
    • Check-out of PS, TagM, TagH, ST after timing window shift [30], [31]
    • Harp Scan [32]
    • Continue production with 250nA beam current
  2. Issues
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?