(Wednesday, January 25 at 08:45)
(Wednesday, January 25 at 08:45)
Line 5: Line 5:
 
== Wednesday, January 25 at 08:45 ==  
 
== Wednesday, January 25 at 08:45 ==  
 
# Last 24 hours
 
# Last 24 hours
 +
#* Beam chopper amplifier replacement
 
#* Solenoid recovery
 
#* Solenoid recovery
#* Diamond alignment
+
#* Diamond alignment?
 
# Issues
 
# Issues
 +
# Noisy tagger hits solved [https://logbooks.jlab.org/entry/3772732]
 
# Reports
 
# Reports
 
# Plans for today
 
# Plans for today

Revision as of 16:18, 28 January 2020

Trigger Spreadsheet

Trigger Counter

Wednesday, January 25 at 08:45

  1. Last 24 hours
    • Beam chopper amplifier replacement
    • Solenoid recovery
    • Diamond alignment?
  2. Issues
  3. Noisy tagger hits solved [1]
  4. Reports
  5. Plans for today
    • Hall B is down for 3 days for installation, possibility for TAC run with our own slit?

Tuesday, January 25 at 08:45

  1. Last 24 hours
    • First day of production with 350nA beam current!
    • PS timing window reduced [2]
    • 11:30 Solenoid trip [3], [4], [5], recovered after reset of cryo compressor
    • 03:50 Solenoid trip [6], [7], instability on power supply, investigation ongoing
    • Issues with chopper → almost no beam loss
  2. Issues
    • TOF point disappearance after window shift [8], [9]
    • Missing DIRC blocks [10]
    • Event size increase due to CCal [11]
  3. Reports
    • Rates [12] (Alexandre)
    • Trigger rates and dead time at 350nA [13] (Sasha)
    • PS multiplicity and timing [14] (Sasha)
  4. Plans for today
    • Work on RF instability (~hours) [15]
    • Start diamond alignment afterwards

Monday, January 24 at 08:45

  1. Last 72 hours
    • Mostly Production with 250nA beam current
    • Empty target runs with 250nA (71533) and 350nA (71532) on Friday
    • Harp Scan on Sunday [16]
    • CCal Anode Tests on Sunday evening (Sasha) [17]
  2. Issues
  3. Reports
  4. Tasks for the today
    • Increase beam current to 350nA
      • Switch off low-energy TagH counters (new EPICS configuration file) [25]
    • No beam study / RF recovery planned
    • Diamond alignment later this week

Friday, January 24 at 08:45

  1. Last 24 hours
    • Production with 250nA beam current
    • Beam current and position [26], [27]
  2. Issues
    • Frozen total PS/FCal rates fixed (Hovanes)
    • Goniometer image missing [28]
  3. Reports:
  4. Tasks for the today and the weekend:
    • Empty target run after the meeting if beam is taken away
    • PS Timing Studies (Friday)?
    • Production
    • CCAL anode study (Saturday)?
  5. Monday:
    • Increase beam current to 350nA

Thursday, January 23 at 08:45

  1. Last 24 hours
    • Various accelerator problems: Arc PS, Injector, Cavity HV [30]
    • Check-out of PS, TagM, TagH, ST after timing window shift [31], [32]
    • Harp Scan [33]
    • Continue production with 250nA beam current
  2. Issues
  3. Reports:
  4. Tasks for today
    • Production
    • DOE tour in Hall B/C (8:00 - 12:00?)
    • Spin dance (12:00?)
  5. Plan for later
    • CCAL anode study?
    • Alternative diamond alignment
    • ST trigger?