# Last 24 hours | # Last 24 hours | ||
− | #* Beam chopper amplifier replacement | + | #* Beam chopper amplifier replacement, recovery at 11pm |
− | #* Solenoid recovery | + | #* Solenoid recovery [https://logbooks.jlab.org/entry/3773289], [https://logbooks.jlab.org/entry/3773263], reached nominal current shortly after midnight |
− | #* | + | #* New microscope discriminator thresholds [https://logbooks.jlab.org/entry/3773145], [https://logbooks.jlab.org/entry/3773262], [https://logbooks.jlab.org/entry/3773302] |
# Issues | # Issues | ||
− | # | + | #* DIRC was off [https://logbooks.jlab.org/entry/3773063] |
# Reports | # Reports | ||
+ | #* Noisy tagger hits solved [https://logbooks.jlab.org/entry/3772732] | ||
# Plans for today | # Plans for today | ||
− | #* Hall B is down for 3 days for installation, possibility for TAC run with our own slit? | + | #* Harp scan |
+ | #* Production | ||
+ | #* Diamond alignment? | ||
+ | #* Hall B is down for 3 days for installation starting Thursday morning, possibility for TAC run with our own slit? | ||
== Tuesday, January 25 at 08:45 == | == Tuesday, January 25 at 08:45 == |
Revision as of 09:29, 29 January 2020
Contents
Wednesday, January 25 at 08:45
- Last 24 hours
- Issues
- DIRC was off [6]
- Reports
- Noisy tagger hits solved [7]
- Plans for today
- Harp scan
- Production
- Diamond alignment?
- Hall B is down for 3 days for installation starting Thursday morning, possibility for TAC run with our own slit?
Tuesday, January 25 at 08:45
- Last 24 hours
- Issues
- Reports
- Plans for today
- Work on RF instability (~hours) [21]
- Start diamond alignment afterwards
Monday, January 24 at 08:45
- Last 72 hours
- Issues
- Reports
- Tasks for the today
- Increase beam current to 350nA
- Switch off low-energy TagH counters (new EPICS configuration file) [31]
- No beam study / RF recovery planned
- Diamond alignment later this week
- Increase beam current to 350nA
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [34]
- Reports:
- Updated sigmas for harp fitting tool [35]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [51]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?