Run Planning Meeting Notes, Jan 23-Jan 29, 2020
From GlueXWiki
Monday, January 24 at 08:45
- Last 72 hours
- Mostly Production with 250nA beam current
- Empty target runs with 250nA (71533) and 350nA (71532) on Friday
- Harp Scan on Sunday [1]
- CCal Anode Tests on Sunday evening (Sasha)
- Issues
- Reports
- Rates: [7]
- Tasks for the today
- Increase beam current to 350nA
- Switch off low-energy TagH counters (new EPICS configuration file) [8]
- No beam study / RF recovery planned
- Diamond alignment later this week
- Increase beam current to 350nA
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [11]
- Reports:
- Updated sigmas for harp fitting tool [12]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [28]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?