Difference between revisions of "Run Planning Meeting Notes, July 28- August 3, 2022"
From GlueXWiki
Line 28: | Line 28: | ||
=== Reports === | === Reports === | ||
=== Plans === | === Plans === | ||
+ | --> | ||
+ | |||
= Monday August 1 = | = Monday August 1 = | ||
− | === Past | + | === Past 72 hours === |
+ | * Fri: ~3.9B triggers | ||
+ | * Sat: ~3.0B triggers | ||
+ | * Sun: >2.5B triggers | ||
+ | * Half-wave plate moved out on Sunday afternoon | ||
+ | * [https://logbooks.jlab.org/entry/4022617 RootSpy issues] and [https://logbooks.jlab.org/entry/4022300 here] | ||
+ | * Counting house not host of zoom meeting [https://logbooks.jlab.org/entry/4022568 log entry] | ||
+ | * Gas shed key missing | ||
=== Shift Reports === | === Shift Reports === | ||
− | * [ Day shift summary ] | + | * [https://logbooks.jlab.org/entry/4022437 Day shift summary ] |
− | * [ Swing shift summary] | + | * [https://logbooks.jlab.org/entry/4022559 Swing shift summary] |
− | * [ Owl shift summary] | + | * [https://logbooks.jlab.org/entry/4022660 Owl shift summary] |
− | * [ Early Riser shift summary] | + | * [https://logbooks.jlab.org/entry/4022736 Early Riser shift summary] |
=== Reports === | === Reports === | ||
=== Plans === | === Plans === | ||
+ | * Switch to empty target during accelerator down time (>=2hr) | ||
+ | * Production running on empty target for 1.5 days | ||
= Sunday July 31 = | = Sunday July 31 = | ||
− | |||
=== Shift Reports === | === Shift Reports === | ||
− | * [ Day shift summary ] | + | * [https://logbooks.jlab.org/entry/4022012 Day shift summary ] |
− | * [ Swing shift summary] | + | * [https://logbooks.jlab.org/entry/4022103 Swing shift summary] |
− | * [ Owl shift summary] | + | * [https://logbooks.jlab.org/entry/4022228 Owl shift summary] |
− | * [ Early Riser shift summary] | + | * [https://logbooks.jlab.org/entry/4022308 Early Riser shift summary] |
− | + | ||
− | + | ||
= Saturday July 30 = | = Saturday July 30 = | ||
− | |||
=== Shift Reports === | === Shift Reports === | ||
− | * [ Day shift summary ] | + | * [https://logbooks.jlab.org/entry/4021606 Day shift summary ] |
− | * [ Swing shift summary] | + | * [https://logbooks.jlab.org/entry/4021773 Swing shift summary] |
− | * [ Owl shift summary] | + | * [https://logbooks.jlab.org/entry/4021859 Owl shift summary] |
− | * [ Early Riser shift summary] | + | * [https://logbooks.jlab.org/entry/4021928 Early Riser shift summary] |
− | + | ||
− | + | ||
− | + | ||
= Friday July 29 = | = Friday July 29 = |
Revision as of 07:01, 1 August 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Monday August 1
Past 72 hours
- Fri: ~3.9B triggers
- Sat: ~3.0B triggers
- Sun: >2.5B triggers
- Half-wave plate moved out on Sunday afternoon
- RootSpy issues and here
- Counting house not host of zoom meeting log entry
- Gas shed key missing
Shift Reports
Reports
Plans
- Switch to empty target during accelerator down time (>=2hr)
- Production running on empty target for 1.5 days
Sunday July 31
Shift Reports
Saturday July 30
Shift Reports
Friday July 29
Past 24 hours
- Thanks Rory for previous RC shift
- Beam studies during Day shift
- Mark D.: Safety walk-through
- Beni: CTOF repair, Mark: gain equalization
- Mark+Malte: FCAL repairs
- Beam returned ~16:30
- ~2.0B triggers
Shift Reports
Reports
Plans
- Long mode run 1/2 hour
- Production running on Pb through weekend
- No meetings over weekend
Thursday July 28
Past 24 hours
- Beam returned ~ noon
- Harp scans
- Production data taking ~ 13:30
- ~2.9B triggers
Shift Reports
Reports
Plans
- Beam Studies today
- Hall-D Walk through - Mark D.
- CTOF PMT Repair - Beni Z.
- Production running on Pb when beam returns