Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"
From GlueXWiki
Line 1: | Line 1: | ||
<- Back to [[Run Coordination Meetings:Fall2019 Run]] | <- Back to [[Run Coordination Meetings:Fall2019 Run]] | ||
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count] | [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count] | ||
+ | |||
+ | == Friday, March 6 == | ||
+ | # Last 24 hours | ||
+ | #* Limited beam yesterday morning, followed by Hall access for [https://logbooks.jlab.org/entry/3797971 Solenoid VCL work] (Scot/Mark) | ||
+ | #* Steady production evening and overnight | ||
+ | # Reports/Issues | ||
+ | #* Rates instability: [https://logbooks.jlab.org/entry/3797873 Added additional beam positions to "default" MyaViewer] | ||
+ | #** No issues overnight. Still plan to request other Hall beam off and Harp Scan if another "dip" is identified by shift crew. | ||
+ | #* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes) | ||
+ | #* ρ and ω yield/trigger (almost) back to nominal values: [https://logbooks.jlab.org/entry/3797966 CCDB time stamp update] (Alex) | ||
+ | #** Still some work to do on TOF calibration + [https://logbooks.jlab.org/entry/3798088 something weird] (Beni) | ||
+ | #* Updated reference plots: thanks Naomi! [https://logbooks.jlab.org/entry/3798088] | ||
+ | # Run Plan | ||
+ | #* Production | ||
== Thursday, March 5 == | == Thursday, March 5 == |
Revision as of 08:24, 6 March 2020
<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count
Friday, March 6
- Last 24 hours
- Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
- Steady production evening and overnight
- Reports/Issues
- Rates instability: Added additional beam positions to "default" MyaViewer
- No issues overnight. Still plan to request other Hall beam off and Harp Scan if another "dip" is identified by shift crew.
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- ρ and ω yield/trigger (almost) back to nominal values: CCDB time stamp update (Alex)
- Still some work to do on TOF calibration + something weird (Beni)
- Updated reference plots: thanks Naomi! [1]
- Rates instability: Added additional beam positions to "default" MyaViewer
- Run Plan
- Production
Thursday, March 5
- Last 24 hours
- Beam off until Wednesday @ 5 pm for injector work
- FCAL work and restoration
- New PDU installed (Nick)
- Restoration: [2][3] (Nick/Colin)
- Solenoid Vapor Cooled Lead (VCL) temperature drop (Mark)
- Reports/Issues
- Accelerator status GUI (Naomi)
- Tagger magnet NMR signal (Tim)
- Tagger field change to photon energy calibration (Richard)
- Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
- ρ and ω yield/trigger back to nominal values: e.g. Run 72076 (Alex)
- Change of timestamp (Logbook entry?)
- Rates instability (Alexandre)
- Run Plan
- Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
- Production