Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
# Reports/Issues
 
# Reports/Issues
 
#* Rates instability: [https://logbooks.jlab.org/entry/3797873 Added additional beam positions to "default" MyaViewer]
 
#* Rates instability: [https://logbooks.jlab.org/entry/3797873 Added additional beam positions to "default" MyaViewer]
#** No issues overnight.  Still plan to request other Hall beam off and Harp Scan if another "dip" is identified by shift crew.
+
#** [https://logbooks.jlab.org/entry/3798410 No major instability overnight.] Still plan to request other Hall beam off and Harp Scan if another "dip" in rate of 30% or more is identified by shift crew.
 +
#** Look back at other halls during previous instabilities (Alexandre)
 +
#* [https://logbooks.jlab.org/entry/3798428 Fluctuating coherent edge for 45/135 PERP] (Naomi)
 +
#* ρ and ω yield/trigger (almost) back to nominal values:
 +
#** [https://logbooks.jlab.org/entry/3797966 Initial CCDB time stamp update] (Alex)
 +
#** [https://logbooks.jlab.org/entry/3798425 Followup to revert TOF timewalk calibration] (Beni)
 +
#* [https://logbooks.jlab.org/entry/3798088 something weird] (Beni)
 +
#* Updated reference plots: thanks Naomi! Experts please check your e-mails. [https://logbooks.jlab.org/entry/3798088]
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
#* ρ and ω yield/trigger (almost) back to nominal values: [https://logbooks.jlab.org/entry/3797966 CCDB time stamp update] (Alex)
 
#** Still some work to do on TOF calibration + [https://logbooks.jlab.org/entry/3798088 something weird] (Beni)
 
#* Updated reference plots: thanks Naomi! [https://logbooks.jlab.org/entry/3798088]
 
 
# Run Plan
 
# Run Plan
 +
#* May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
 
#* Production
 
#* Production
  

Revision as of 09:35, 6 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production