Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"

From GlueXWiki
Jump to: navigation, search
Line 17: Line 17:
 
#* Updated reference plots: thanks Naomi! Experts please check your e-mails. [https://logbooks.jlab.org/entry/3798088]
 
#* Updated reference plots: thanks Naomi! Experts please check your e-mails. [https://logbooks.jlab.org/entry/3798088]
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
# Run Plan
+
# Run Plan (Friday + Weekend)
 
#* May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
 
#* May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
 
#* Production
 
#* Production
 +
# Longer term
 +
#* Hall C down for configuration change 3/13-3/20.  Good opportunity for low current TAC run.
  
 
==  Thursday, March 5 ==  
 
==  Thursday, March 5 ==  

Revision as of 09:41, 6 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production